IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,801

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0508 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $6,113 $6,000 Implemented
IA0508 # 05 Y:2013 05 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $689 $1,590 Implemented
IA0508 # 08 Y:2013 08 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,512 $1,000 Implemented
IA0508 # 09 Y:2013 09 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $3,758 $976 Implemented
WM0030 # 06 Y:2013 06 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $34,398 $69,000 Implemented
WV0474 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,986 $15,864 Implemented
WV0474 # 03 Y:2013 03 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,698 $1,000 Implemented
WV0474 # 05 Y:2013 05 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,920 $72 Implemented
WV0474 # 06 Y:2013 06 2013 DEVELOP A REPAIR/REPLACE POLICY $1,715 $392 Implemented
WV0474 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,586 $324 Implemented
WV0474 # 10 Y:2013 10 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $407 $500 Implemented
IA0505 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $503 $50 Implemented
IA0505 # 03 Y:2013 03 2013 INSULATE BARE EQUIPMENT $319 $100 Implemented
IA0505 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,467 $845 Implemented
IA0505 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $795 $200 Implemented
IA0505 # 06 Y:2013 06 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,315 $910 Implemented
IA0505 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $920 $233 Implemented
IA0505 # 08 Y:2013 08 2013 INSTALL OCCUPANCY SENSORS $1,567 $5,123 Implemented
IA0505 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $810 $270 Implemented
IA0505 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $514 $1,066 Implemented
IA0505 # 11 Y:2013 11 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $2,880 $100 Implemented
MZ0129 # 01 Y:2013 01 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $56,550 $18,200 Implemented
MZ0129 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,082 $1,800 Implemented
MZ0129 # 04 Y:2013 04 2013 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,563 $760 Implemented
MZ0129 # 05 Y:2013 05 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20,763 $63,637 Implemented