IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,801

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0685 # 04 Y:2011 04 2011 REDUCE VENTILATION AIR $2,713 $6,300 Implemented
UA0071 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $2,105 $2,719 Implemented
UA0071 # 03 Y:2011 03 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $31,348 $0 Implemented
UA0069 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,865 $24,690 Implemented
TT0079 # 01 Y:2011 01 2011 DISCONNECT BALLASTS $508 $0 Implemented
TT0079 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $336 $0 Implemented
TT0079 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $205 $0 Implemented
TT0079 # 06 Y:2011 06 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,937 $0 Implemented
UA3016 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,180 $1,500 Implemented
IA0473 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,500 $105 Implemented
IA0473 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,238 $4,669 Implemented
IA0473 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $615 $1,273 Implemented
DL0079 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,495 $36,850 Implemented
DL0079 # 03 Y:2011 03 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,737 $100 Implemented
DL0079 # 04 Y:2011 04 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,364 $1,015 Implemented
DL0079 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $7,317 $350 Implemented
DL0079 # 08 Y:2011 08 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $464 $105 Implemented
NC0436 # 03 Y:2011 03 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,076 $4,000 Implemented
NC0436 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,560 $100 Implemented
NC0436 # 06 Y:2011 06 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $12,954 $6,435 Implemented
NC0436 # 08 Y:2011 08 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,009 $1,000 Implemented
IC0189 # 01 Y:2011 01 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,166 $0 Implemented
IC0189 # 02 Y:2011 02 2011 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $156,506 $686,583 Implemented
IC0189 # 03 Y:2011 03 2011 UPGRADE OBSOLETE EQUIPMENT $12,266 $100,000 Implemented
IC0189 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,263 $1,142 Implemented