Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
412
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0157 # 10 Y:2007 | 10 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,435 | $1,210 | Not Implemented |
UF0405 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $47,407 | $51,387 | Implemented |
UF0405 # 02 Y:2007 | 02 | 2007 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $4,716 | $834 | Not Implemented |
UF0405 # 03 Y:2007 | 03 | 2007 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $5,532 | $545 | Implemented |
UF0405 # 04 Y:2007 | 04 | 2007 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $8,668 | $0 | Implemented |
UF0405 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,530 | $1,396 | Implemented |
UF0405 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,272 | $0 | Implemented |
UF0405 # 07 Y:2007 | 07 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $49,615 | $42,263 | Not Implemented |
UF0405 # 08 Y:2007 | 08 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $3,895 | $542 | Implemented |
UF0405 # 09 Y:2007 | 09 | 2007 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,037 | $12 | Implemented |
UF0405 # 10 Y:2007 | 10 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $44,942 | $29,100 | Not Implemented |
UF0405 # 11 Y:2007 | 11 | 2007 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $33,577 | $25,436 | Not Implemented |
UF0405 # 12 Y:2007 | 12 | 2007 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $595 | $3,486 | Not Implemented |
UF0405 # 13 Y:2007 | 13 | 2007 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,175 | $8,000 | Not Implemented |
MI0154 # 01 Y:2007 | 01 | 2007 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $99,787 | $131,000 | Not Implemented |
MI0154 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,215 | $73,710 | Implemented |
MI0154 # 03 Y:2007 | 03 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $30,511 | $120 | Implemented |
MI0154 # 04 Y:2007 | 04 | 2007 | DISCONNECT BALLASTS | $27,192 | $1,450 | Not Implemented |
MI0154 # 05 Y:2007 | 05 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,388 | $1,250 | Not Implemented |
MI0154 # 06 Y:2007 | 06 | 2007 | PAY BILLS ON TIME TO AVOID LATE FEES | $3,146 | $300 | Implemented |
MI0154 # 07 Y:2007 | 07 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,092 | $1,074 | Implemented |
MI0154 # 08 Y:2007 | 08 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,043 | $30 | Implemented |
UF0402 # 01 Y:2007 | 01 | 2007 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $29,529 | $1,827 | Not Implemented |
UF0402 # 02 Y:2007 | 02 | 2007 | USE OPTIMUM THICKNESS INSULATION | $640 | $2,320 | Not Implemented |
UF0402 # 03 Y:2007 | 03 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $335 | $177 | Implemented |