Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,773
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0264 # 08 Y:2014 | 08 | 2014 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $5,408 | $140 | Implemented |
MI0264 # 09 Y:2014 | 09 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,031 | $140 | Not Implemented |
MI0264 # 10 Y:2014 | 10 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,344 | $4,800 | Implemented |
MI0264 # 11 Y:2014 | 11 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,707 | $3,170 | Not Implemented |
MI0264 # 12 Y:2014 | 12 | 2014 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $2,115 | $520 | Implemented |
MI0264 # 13 Y:2014 | 13 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,870 | $2,960 | Not Implemented |
MI0264 # 14 Y:2014 | 14 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,886 | $1,660 | Implemented |
MI0264 # 15 Y:2014 | 15 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,646 | $1,660 | Implemented |
MI0264 # 16 Y:2014 | 16 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,316 | $80 | Implemented |
MI0264 # 17 Y:2014 | 17 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,179 | $80 | Implemented |
MI0264 # 18 Y:2014 | 18 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,127 | $80 | Implemented |
MI0264 # 19 Y:2014 | 19 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $782 | $1,660 | Not Implemented |
MI0264 # 20 Y:2014 | 20 | 2014 | INSTALL OCCUPANCY SENSORS | $542 | $83 | Not Implemented |
MI0264 # 21 Y:2014 | 21 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $485 | $80 | Not Implemented |
UD0906 # 01 Y:2014 | 01 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $17,248 | $0 | Not Implemented |
UD0906 # 02 Y:2014 | 02 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,093 | $0 | Implemented |
UD0906 # 03 Y:2014 | 03 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,503 | $0 | Implemented |
UD0906 # 04 Y:2014 | 04 | 2014 | INSTALL OCCUPANCY SENSORS | $2,954 | $1,575 | Implemented |
UD0906 # 05 Y:2014 | 05 | 2014 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $5,162 | $10,000 | Not Implemented |
UD0906 # 06 Y:2014 | 06 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,456 | $5,614 | Implemented |
UD0906 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,271 | $1,000 | Implemented |
UD0906 # 08 Y:2014 | 08 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $618 | $0 | Not Implemented |
UD0906 # 09 Y:2014 | 09 | 2014 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $58,357 | $14,000 | Not Implemented |
SD0486 # 01 Y:2014 | 01 | 2014 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $75,586 | $286,300 | Not Implemented |
SD0486 # 02 Y:2014 | 02 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $54,581 | $250,000 | Not Implemented |