Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,773
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0359 # 06 Y:2014 | 06 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,476 | $4,124 | Implemented |
TT0126 # 01 Y:2014 | 01 | 2014 | OPTIMIZE PLANT POWER FACTOR | $5,874 | $24,000 | Implemented |
TT0126 # 02 Y:2014 | 02 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,406 | $7,500 | Implemented |
TT0126 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,851 | $4,000 | Implemented |
TT0126 # 04 Y:2014 | 04 | 2014 | DISCONNECT BALLASTS | $346 | $110 | Implemented |
TT0126 # 05 Y:2014 | 05 | 2014 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,806 | $4,900 | Implemented |
TT0126 # 06 Y:2014 | 06 | 2014 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $43,000 | $35,238 | Not Implemented |
SD0480 # 01 Y:2014 | 01 | 2014 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $102,356 | $456,500 | Not Implemented |
SD0480 # 02 Y:2014 | 02 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $58,476 | $249,000 | Not Implemented |
SD0480 # 03 Y:2014 | 03 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $13,051 | $52,333 | Not Implemented |
SD0480 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,662 | $300 | Implemented |
SD0480 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,971 | $5,075 | Not Implemented |
SD0480 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,686 | $4,500 | Not Implemented |
SD0480 # 07 Y:2014 | 07 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,176 | $3,050 | Not Implemented |
SD0480 # 08 Y:2014 | 08 | 2014 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $634 | $370 | Not Implemented |
UM0439 # 01 Y:2014 | 01 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $32,824 | $20,000 | Not Implemented |
UM0439 # 02 Y:2014 | 02 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,150 | $21,000 | Not Implemented |
UM0439 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,596 | $2,500 | Implemented |
UM0439 # 04 Y:2014 | 04 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $27,566 | $4,000 | Implemented |
TT0128 # 01 Y:2014 | 01 | 2014 | DISCONNECT BALLASTS | $293 | $0 | Implemented |
TT0128 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $125 | $180 | Implemented |
TT0128 # 03 Y:2014 | 03 | 2014 | INSTALL OCCUPANCY SENSORS | $1,294 | $1,550 | Implemented |
TT0128 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,860 | $15,980 | Implemented |
TT0128 # 05 Y:2014 | 05 | 2014 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $14,016 | $23,710 | Implemented |
TT0128 # 06 Y:2014 | 06 | 2014 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $598 | $2,350 | Implemented |