IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

412

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0354 # 03 Y:2004 03 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,795 $62,620 Not Implemented
UF0354 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,169 $745 Not Implemented
UF0354 # 05 Y:2004 05 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $7,962 $31,000 Implemented
UF0354 # 06 Y:2004 06 2004 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $6,140 $779 Not Implemented
UF0354 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,543 $0 Implemented
UF0354 # 08 Y:2004 08 2004 ADD AREA LIGHTING SWITCHES $2,354 $11,495 Not Implemented
UF0354 # 09 Y:2004 09 2004 RECYCLE FLUORESCENT LAMPS $2,883 $3,496 Not Implemented
MI0095 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,778 $600 Not Implemented
MI0095 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $70,081 $2,300 Not Implemented
MI0095 # 03 Y:2004 03 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $120,575 $0 Not Implemented
MI0095 # 04 Y:2004 04 2004 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,100 $5,660 Not Implemented
MI0095 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $862 $543 Not Implemented
MI0095 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,100 $144 Implemented
MI0095 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,514 $894 Not Implemented
MI0095 # 08 Y:2004 08 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $458 $186 Implemented
MI0089 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $13,096 $600 Not Implemented
MI0089 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $22,325 $2,300 Implemented
MI0089 # 03 Y:2004 03 2004 CHECK FOR ACCURACY OF UTILITY / POWER METERS $15,302 $270 Not Implemented
MI0089 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,010 $590 Implemented
MI0089 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $25,036 $50 Implemented
MI0089 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,772 $25,286 Implemented
MI0089 # 07 Y:2004 07 2004 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,783 $4,328 Not Implemented
MI0086 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $21,915 $2,300 Implemented
MI0086 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $3,200 $2,300 Implemented
MI0086 # 03 Y:2004 03 2004 AIR CONDITION ONLY SPACE NECESSARY $792 $80 Implemented