IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,763

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0408 # 07 Y:2010 07 2010 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $7,384 $8,500 Not Implemented
WV0408 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,726 $316 Implemented
WV0408 # 09 Y:2010 09 2010 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,520 $1,123 Implemented
WV0408 # 10 Y:2010 10 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,435 $1,900 Implemented
WV0408 # 11 Y:2010 11 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,043 $1,250 Not Implemented
WV0408 # 12 Y:2010 12 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,505 $6,725 Not Implemented
WV0408 # 13 Y:2010 13 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $415 $1,118 Not Implemented
MI0189 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,029 $1,210 Implemented
MI0189 # 01 Y:2010 01 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $15,179 $5,366 Not Implemented
MI0189 # 02 Y:2010 02 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,451 $2,000 Implemented
MI0189 # 03 Y:2010 03 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,033 $10,500 Implemented
MI0189 # 04 Y:2010 04 2010 INSTALL SKYLIGHTS $4,317 $2,400 Not Implemented
MI0189 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,161 $7,164 Implemented
UM0369 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $8,910 $1,680 Implemented
UM0369 # 02 Y:2010 02 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $4,068 $10 Not Implemented
UM0369 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $695 $2,500 Implemented
UM0369 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $443 $2,210 Not Implemented
UM0369 # 05 Y:2010 05 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,318 $21,700 Implemented
UM0369 # 06 Y:2010 06 2010 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $11,181 $2,254 Implemented
UM0369 # 07 Y:2010 07 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,409 $1,874 Not Implemented
UM0369 # 08 Y:2010 08 2010 INSULATE FEEDWATER TANK $1,281 $1,449 Not Implemented
UM0369 # 09 Y:2010 09 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,164 $1,000 Implemented
UM0369 # 10 Y:2010 10 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,010 $1,300 Implemented
UM0368 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,687 $124,913 Not Implemented
UM0368 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,110 $6,000 Not Implemented