IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

70

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0474 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,935 $516 Implemented
AS0474 # 06 Y:2019 06 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,267 $110 Not Implemented
AS0474 # 07 Y:2019 07 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $838 $687 Not Implemented
AS0456 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,670 $51,257 Not Implemented
AS0456 # 07 Y:2018 07 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $24,546 $0 Not Implemented
AS0456 # 06 Y:2018 06 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $82,206 $176,400 Implemented
AS0456 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $30,900 $16,614 Not Implemented
AS0456 # 03 Y:2018 03 2018 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $46,649 $220,160 Not Implemented
AS0456 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,727 $13,500 Not Implemented
AS0456 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,722 $320 Implemented
SD0402 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,022 $11,175 Implemented
SD0402 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $125,747 $39,474 Not Implemented
SD0402 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,958 $11,073 Not Implemented
SD0402 # 08 Y:2008 08 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,363 $900 Implemented
SD0402 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $74,987 $130,635 Not Implemented
SD0402 # 03 Y:2008 03 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $38,170 $88,300 Not Implemented
SD0402 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,796 $46,094 Not Implemented
SD0402 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,282 $11,175 Not Implemented
AS0421 # 01 Y:2006 01 2006 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $79,716 $39,658 n/a
AS0421 # 02 Y:2006 02 2006 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $3,068 $1,500 n/a
AS0421 # 03 Y:2006 03 2006 INSTALL EFFICIENT RECTIFIERS $576 $15,000 n/a
AS0416 # 01 Y:2006 01 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $31,751 $36,000 Not Implemented
AS0416 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,872 $34,827 Implemented
AS0416 # 03 Y:2006 03 2006 PAY BILLS ON TIME TO AVOID LATE FEES $3,096 $0 Implemented
AS0416 # 04 Y:2006 04 2006 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $1,237 $0 Not Implemented