IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,754

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0405 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,407 $51,387 Implemented
UF0405 # 02 Y:2007 02 2007 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $4,716 $834 Not Implemented
UF0405 # 03 Y:2007 03 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,532 $545 Implemented
UF0405 # 04 Y:2007 04 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $8,668 $0 Implemented
UF0405 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,530 $1,396 Implemented
UF0405 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,272 $0 Implemented
UF0405 # 07 Y:2007 07 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $49,615 $42,263 Not Implemented
UF0405 # 08 Y:2007 08 2007 INSTALL TIMERS AND/OR THERMOSTATS $3,895 $542 Implemented
UF0405 # 09 Y:2007 09 2007 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,037 $12 Implemented
UF0405 # 10 Y:2007 10 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,942 $29,100 Not Implemented
UF0405 # 11 Y:2007 11 2007 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $33,577 $25,436 Not Implemented
UF0405 # 12 Y:2007 12 2007 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $595 $3,486 Not Implemented
UF0405 # 13 Y:2007 13 2007 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,175 $8,000 Not Implemented
UW0003 # 01 Y:2007 01 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,385 $50,000 Not Implemented
UW0003 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $929 $2,100 Implemented
UW0003 # 03 Y:2007 03 2007 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,723 $20,750 Not Implemented
UW0003 # 04 Y:2007 04 2007 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,551 $7,020 Implemented
UW0003 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $905 $1,200 Implemented
IC0129 # 01 Y:2007 01 2007 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $14,537 $81,554 Implemented
IC0129 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,611 $1,035 Implemented
IC0129 # 03 Y:2007 03 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,183 $4,040 Not Implemented
IC0129 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,613 $22,008 Implemented
IC0129 # 05 Y:2007 05 2007 UPGRADE CONTROLS ON COMPRESSORS $561 $0 Implemented
IC0129 # 06 Y:2007 06 2007 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,946 $2,902 Implemented
IC0129 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $506 $1,782 Implemented