IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,706

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0004 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,000 $97,570 Not Implemented
DL0004 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,160 $800 Not Implemented
DL0004 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,933 $500 Not Implemented
DL0004 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,506 $33,000 Not Implemented
DL0004 # 06 Y:2007 06 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $93,700 $130,000 Not Implemented
DL0004 # 07 Y:2007 07 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,203 $8,830 Not Implemented
TT0006 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,109 $2,900 Implemented
TT0006 # 02 Y:2007 02 2007 USE COMPRESSOR AIR FILTERS $7,465 $4,240 Implemented
TT0006 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,910 $164,448 Not Implemented
TT0006 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,827 $4,514 Not Implemented
UD0764 # 01 Y:2007 01 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $101,033 $243,645 Not Implemented
UD0764 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $35,952 $98,336 Implemented
UD0764 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,818 $49,600 Implemented
UD0764 # 04 Y:2007 04 2007 OPTIMIZE PLANT POWER FACTOR $24,334 $6,000 Not Implemented
UD0764 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,675 $1,275 Implemented
UD0764 # 06 Y:2007 06 2007 INSTALL REPLACEMENT DOORS $6,223 $13,000 Not Implemented
UD0764 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $3,230 $760 Implemented
UD0764 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,437 $0 Implemented
UM0320 # 01 Y:2007 01 2007 REDUCE VENTILATION AIR $20,841 $4,960 Not Implemented
UM0320 # 02 Y:2007 02 2007 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $19,072 $0 Implemented
UM0320 # 03 Y:2007 03 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,725 $3,000 Not Implemented
UM0320 # 04 Y:2007 04 2007 REVISE SMOKE CLEANUP FROM OPERATIONS $11,829 $1,846 Implemented
UM0320 # 05 Y:2007 05 2007 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,797 $0 Implemented
UM0320 # 06 Y:2007 06 2007 OPTIMIZE PLANT POWER FACTOR $10,572 $19,721 Implemented
UM0320 # 07 Y:2007 07 2007 RECOVER WASTE HEAT FROM EQUIPMENT $7,938 $500 Implemented