Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,754

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0085 # 06 Y:2004 06 2004 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $20,000 $0 Not Implemented
MI0085 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $263 $102 Implemented
UM0260 # 01 Y:2004 01 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $38,413 $10,000 Not Implemented
UM0260 # 02 Y:2004 02 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $33,620 $12,000 Implemented
UM0260 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,181 $13,690 Not Implemented
UM0260 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,671 $1,000 Implemented
UM0260 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,831 $2,000 Implemented
UM0260 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,283 $1,050 Implemented
UM0260 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $1,054 $1,564 Not Implemented
UU0061 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,895 $18,633 Not Implemented
UU0061 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $267 $1,000 Not Implemented
UU0061 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $274 $0 Implemented
UU0061 # 04 Y:2004 04 2004 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $18,030 $11,000 Not Implemented
UU0061 # 05 Y:2004 05 2004 CONTRACT OUT MAINTENANCE $15,000 $2,000 Not Implemented
UU0061 # 06 Y:2004 06 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $351 $432 Implemented
UM0258 # 01 Y:2004 01 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $29,426 $500 Not Implemented
UM0258 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,300 $15,300 Not Implemented
UM0258 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,545 $1,275 Not Implemented
UM0258 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,828 $900 Not Implemented
UM0258 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $4,117 $7,220 Not Implemented
UM0258 # 06 Y:2004 06 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,963 $2,000 Not Implemented
UM0258 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $2,720 $5,925 Not Implemented
UM0258 # 08 Y:2004 08 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,480 $500 Not Implemented
MI0080 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,571 $10,600 Not Implemented
MI0080 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $7,438 $2,300 Implemented