IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,754

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0687 # 03 Y:2004 03 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,090 $0 Not Implemented
UD0687 # 04 Y:2004 04 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,420 $9,650 Not Implemented
UD0687 # 05 Y:2004 05 2004 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $2,740 $540 Not Implemented
UD0687 # 06 Y:2004 06 2004 DISCONNECT BALLASTS $2,430 $2,610 Implemented
UD0687 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,030 $2,350 Not Implemented
UD0687 # 08 Y:2004 08 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $365 $450 Implemented
UD0687 # 09 Y:2004 09 2004 PAY BILLS ON TIME TO AVOID LATE FEES $180 $649 Not Implemented
UD0687 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $165 $15 Implemented
LE0180 # 01 Y:2004 01 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $46,917 $0 Implemented
LE0180 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,802 $17,364 Not Implemented
LE0180 # 03 Y:2004 03 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,024 $2,200 Implemented
LE0180 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,020 $300 Implemented
LE0180 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,067 $1,200 Implemented
LE0180 # 06 Y:2004 06 2004 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $942 $550 Implemented
LE0180 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $903 $1,350 Not Implemented
SU0174 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,108 $0 Implemented
SU0174 # 02 Y:2004 02 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $58,500 $16,260 Implemented
SU0174 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $85 $45 Implemented
SU0174 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,102 $13,384 Implemented
SU0174 # 05 Y:2004 05 2004 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $13,639 $14,240 Implemented
SU0174 # 06 Y:2004 06 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,489 $10,360 Implemented
OR0448 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,100 $5,000 Implemented
OR0448 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,300 $0 Implemented
OR0448 # 03 Y:2004 03 2004 INSTALL CONTINUOUS LUBRICATION EQUIPMENT $14,430 $1,000 Not Implemented
OR0448 # 04 Y:2004 04 2004 $247,000 $1,382,000 Not Implemented