IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

401

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0235 # 06 Y:2021 06 2021 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,383 $708 Not Implemented
UA0235 # 05 Y:2021 05 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $26,697 $150 Implemented
UA0235 # 04 Y:2021 04 2021 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,001 $808 Implemented
UA0235 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,979 $2,094 Implemented
UA0235 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $16,096 $8,577 Not Implemented
UA0235 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,903 $5,078 Not Implemented
UA0224 # 06 Y:2020 06 2020 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $20,503 $12,612 Not Implemented
UA0224 # 05 Y:2020 05 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,983 $20,013 Not Implemented
UA0224 # 04 Y:2020 04 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,259 $16,524 Not Implemented
UA0224 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,994 $9,795 Not Implemented
UA0224 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,645 $50 Not Implemented
UA0224 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,443 $2,681 Not Implemented
UA0222 # 06 Y:2020 06 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $22,556 $500 Not Implemented
UA0222 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,178 $50 Not Implemented
UA0222 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,527 $7,775 Implemented
UA0222 # 03 Y:2020 03 2020 COMBINE UTILITY METERS $26,371 $60,000 Not Implemented
UA0222 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $12,593 $6,955 Not Implemented
UA0222 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,232 $92,405 Implemented
UA0215 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $678 $970 Implemented
UA0215 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $816 $50 Implemented
UA0215 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $663 $539 Not Implemented
UA0215 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,328 $11,266 Not Implemented
UA0215 # 01 Y:2019 01 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,317 $50 Implemented
UA0212 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,075 $9,350 Not Implemented
UA0212 # 03 Y:2019 03 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,989 $30,818 Not Implemented