IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

777

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1049 # 06 Y:2023 06 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,943 $20,000 Not Implemented
UD1049 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,075 $952 Not Implemented
UD1049 # 04 Y:2023 04 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $72,916 $709 Not Implemented
UD1049 # 03 Y:2023 03 2023 REDUCE VENTILATION AIR $153,776 $45,000 Not Implemented
UD1049 # 02 Y:2023 02 2023 CHECK FOR ACCURACY OF UTILITY / POWER METERS $9,224 $0 Not Implemented
UD1049 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,825 $0 Implemented
UL2214 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $67,238 $1,046,392 Not Implemented
UL2214 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $43,721 $432,345 Not Implemented
UL2214 # 03 Y:2022 03 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,475 $0 Not Implemented
UL2214 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $626 $3,993 Not Implemented
UL2214 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,543 $0 Not Implemented
UL2214 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,187 $1,760 Not Implemented
UL2214 # 07 Y:2022 07 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $612 $0 Not Implemented
UD1046 # 14 Y:2022 14 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $386,941 $554,028 Implemented
UD1046 # 13 Y:2022 13 2022 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $127,137 $75,000 Implemented
UD1046 # 12 Y:2022 12 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,614 $5,220 Not Implemented
UD1046 # 11 Y:2022 11 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,765 $4,001 Not Implemented
UD1046 # 10 Y:2022 10 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,940 $0 Not Implemented
UD1046 # 09 Y:2022 09 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $35,495 $1,200 Not Implemented
UD1046 # 08 Y:2022 08 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $27,755 $60,000 Not Implemented
UD1046 # 07 Y:2022 07 2022 RECOVER WASTE HEAT FROM EQUIPMENT $12,615 $1,500 Not Implemented
UD1046 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,166 $0 Implemented
UD1046 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,795 $3,279 Not Implemented
UD1046 # 04 Y:2022 04 2022 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $43,076 $3,500 Implemented
UD1046 # 03 Y:2022 03 2022 IMPROVE COMBUSTION CONTROL CAPABILITY $261,813 $100 Not Implemented