IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

116

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0327 # 01 Y:2011 01 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $92,227 $175,000 Implemented
LE0327 # 02 Y:2011 02 2011 REPLACE BOILER $91,620 $240,000 Not Implemented
LE0327 # 03 Y:2011 03 2011 INSTALL TIMERS AND/OR THERMOSTATS $61,378 $125 Implemented
LE0327 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,335 $94,400 Not Implemented
LE0327 # 05 Y:2011 05 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $15,778 $2,102 Not Implemented
LE0327 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $5,653 $7,280 Not Implemented
LE0327 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,286 $1,900 Implemented
LE0327 # 08 Y:2011 08 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $360 $400 Not Implemented
LE0321 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,801 $8,300 Implemented
LE0321 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,323 $1,360 Implemented
LE0321 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,529 $30 Implemented
LE0321 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,115 $800 Not Implemented
LE0321 # 05 Y:2011 05 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,996 $7,200 Not Implemented
LE0321 # 06 Y:2011 06 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,196 $165 Implemented
LE0321 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,464 $60,000 Not Implemented
LE0321 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,803 $18,000 Implemented
DL0047 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $6,774 $0 Implemented
DL0047 # 02 Y:2010 02 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $4,044 $0 Not Implemented
DL0047 # 03 Y:2010 03 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,212 $0 Implemented
DL0047 # 04 Y:2010 04 2010 DISCONNECT BALLASTS $1,481 $0 Not Implemented
DL0047 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,068 $0 Implemented
DL0047 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $4,117 $690 Not Implemented
DL0047 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,000 $6,000 Implemented
DL0047 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $3,491 $1,573 Implemented
DL0047 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,972 $3,840 Not Implemented