IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

260

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0236 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,574 $40 Not Implemented
TT0236 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,447 $15,750 Not Implemented
TT0236 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,754 $2,700 Not Implemented
TT0236 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,250 $128,083 Implemented
TT0236 # 02 Y:2020 02 2020 ADOPT IN-HOUSE MATERIAL GENERATION $28,629 $16,000 Implemented
TT0236 # 01 Y:2020 01 2020 OPTIMIZE PLANT POWER FACTOR $28,173 $90,000 Not Implemented
TT0229 # 04 Y:2019 04 2019 RECOVER WASTE HEAT FROM EQUIPMENT $8,523 $15,000 Not Implemented
TT0229 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,943 $5,000 Not Implemented
TT0229 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,190 $13,430 Not Implemented
TT0229 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,772 $12,000 Not Implemented
TT0229 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $5,315 $24,000 Not Implemented
TT0229 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,229 $9,752 Implemented
TT0223 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,556 $7,425 Not Implemented
TT0223 # 01 Y:2019 01 2019 RECOVER WASTE HEAT FROM EQUIPMENT $60,944 $189,000 Not Implemented
TT0223 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,339 $172,868 Implemented
TT0223 # 03 Y:2019 03 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $23,500 $2,000 Not Implemented
TT0223 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,403 $80 Not Implemented
TT0223 # 06 Y:2019 06 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,372 $3,900 Not Implemented
TT0223 # 07 Y:2019 07 2019 APPLY FOR INVESTMENT INCENTIVES $4,144 $40 Not Implemented
TT0223 # 08 Y:2019 08 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,166 $1,000 Not Implemented
TT0223 # 09 Y:2019 09 2019 OPTIMIZE PLANT POWER FACTOR $657 $1,500 Not Implemented
TT0223 # 10 Y:2019 10 2019 RECOVER WASTE HEAT FROM EQUIPMENT $159 $200 Not Implemented
TT0216 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,494 $3,750 Implemented
TT0216 # 01 Y:2019 01 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,451 $2,000 Not Implemented
TT0216 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $14,507 $20,000 Implemented