Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,754
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0278 # 07 Y:2022 | 07 | 2022 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,425 | $0 | Implemented |
TT0278 # 08 Y:2022 | 08 | 2022 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $2,362 | $2,736 | Implemented |
UF0578 # 01 Y:2022 | 01 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $15,842 | $11,742 | Implemented |
UF0578 # 02 Y:2022 | 02 | 2022 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $12,457 | $4,590 | Not Implemented |
UF0578 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,829 | $2,419 | Implemented |
UF0578 # 04 Y:2022 | 04 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,565 | $25,400 | Not Implemented |
UF0578 # 05 Y:2022 | 05 | 2022 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $7,688 | $0 | Implemented |
UF0578 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,461 | $390 | Implemented |
UF0578 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,930 | $0 | Implemented |
UF0578 # 08 Y:2022 | 08 | 2022 | INSTALL OCCUPANCY SENSORS | $1,065 | $1,710 | Implemented |
TT0273 # 01 Y:2022 | 01 | 2022 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $197,305 | $1,241,200 | Not Implemented |
TT0273 # 02 Y:2022 | 02 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $65,016 | $5,000 | Implemented |
TT0273 # 03 Y:2022 | 03 | 2022 | INSULATE BARE EQUIPMENT | $51,693 | $8,551 | Not Implemented |
TT0273 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,155 | $2,860 | Implemented |
TT0273 # 05 Y:2022 | 05 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,192 | $2,000 | Not Implemented |
TT0273 # 06 Y:2022 | 06 | 2022 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,707 | $400 | Not Implemented |
TT0273 # 07 Y:2022 | 07 | 2022 | INSULATE BARE EQUIPMENT | $1,084 | $428 | Not Implemented |
TT0273 # 08 Y:2022 | 08 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,072 | $1,926 | Implemented |
TT0273 # 09 Y:2022 | 09 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $780 | $2,250 | Not Implemented |
TT0273 # 10 Y:2022 | 10 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $633 | $1,500 | Not Implemented |
TT0273 # 11 Y:2022 | 11 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $356 | $700 | Implemented |
CC0003 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,652 | $12,041 | n/a |
CC0003 # 02 Y:2022 | 02 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,633 | $0 | n/a |
CC0003 # 03 Y:2022 | 03 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $990 | $0 | n/a |
CC0003 # 04 Y:2022 | 04 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $5,980 | $0 | n/a |