IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

263

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0392 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,246 $20,870 Not Implemented
SD0392 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,991 $7,991 Not Implemented
SD0392 # 03 Y:2007 03 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,417 $17,500 Not Implemented
SD0392 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,970 $0 Not Implemented
LM0102 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,202 $500 Implemented
LM0102 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,058 $1,000 Implemented
LM0102 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,712 $200 Implemented
LM0102 # 04 Y:2005 04 2005 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $450,000 $15,000 Not Implemented
LM0102 # 05 Y:2005 05 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,258,000 $1,250,000 Implemented
LM0098 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,551 $700 Implemented
LM0098 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $148 $308 Not Implemented
LM0098 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,413 $6,375 Not Implemented
LM0098 # 04 Y:2005 04 2005 INSTALL SENSORS TO DETECT DEFECTS $94,133 $49,500 Implemented
LM0098 # 05 Y:2005 05 2005 DEVELOP STANDARD OPERATING PROCEDURES $216,000 $11,800 Implemented
LM0098 # 06 Y:2005 06 2005 MOVE PRODUCT USING MECHANICAL MEANS $30,000 $20,000 Not Implemented
LM0098 # 07 Y:2005 07 2005 INSTALL AUTOMATIC PACKING EQUIPMENT $27,000 $50,000 Not Implemented
LM0063 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,244 $140 Implemented
LM0063 # 02 Y:2003 02 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,129 $0 Implemented
LM0063 # 03 Y:2003 03 2003 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $80 $30 Implemented
LM0063 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $828 $232 Implemented
LM0063 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $68 $85 Not Implemented
SF0261 # 01 Y:2003 01 2003 REPAIR AND ELIMINATE STEAM LEAKS $10,012 $0 Implemented
SF0261 # 02 Y:2003 02 2003 UPGRADE CONTROLS ON COMPRESSORS $3,924 $52 Not Implemented
SF0261 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $4,341 $485 Not Implemented
SF0261 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,010 $33,679 Not Implemented