Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
114
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2506 # 04 Y:2025 | 04 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,688 | $54,000 | n/a |
UW2506 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,155 | $25,000 | n/a |
UW2506 # 02 Y:2025 | 02 | 2025 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $14,113 | $1,255 | n/a |
UW2506 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,528 | $15,530 | n/a |
UW2506 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $75,836 | $644,978 | n/a |
UW2506 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $6,019 | $7,709 | n/a |
UW2506 # 01 Y:2025 | 01 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $8,164 | $187,200 | n/a |
UW2505 # 03 Y:2025 | 03 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $20,963 | $191,676 | n/a |
UW2505 # 04 Y:2025 | 04 | 2025 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $55,282 | $123,500 | n/a |
UW2505 # 06 Y:2025 | 06 | 2025 | USE OPTIMUM THICKNESS INSULATION | $950 | $3,710 | n/a |
UW2505 # 05 Y:2025 | 05 | 2025 | INSULATE FEEDWATER TANK | $815 | $443 | n/a |
UW2505 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,747 | $15,000 | n/a |
UW2505 # 02 Y:2025 | 02 | 2025 | REPAIR OR REPLACE STEAM TRAPS | $30,117 | $4,550 | n/a |
UW2503 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,132 | $25,000 | n/a |
UW2503 # 04 Y:2025 | 04 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $52,839 | $2,112 | n/a |
UW2503 # 02 Y:2025 | 02 | 2025 | INSULATE FEEDWATER TANK | $1,063 | $489 | n/a |
UW2503 # 05 Y:2025 | 05 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $19,848 | $210,600 | n/a |
UW2503 # 01 Y:2025 | 01 | 2025 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $22,742 | $12,849 | n/a |
UW2407 # 02 Y:2024 | 02 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $90,353 | $650,364 | Not Implemented |
UW2407 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $7,000 | $9,000 | Not Implemented |
UW2407 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $2,085 | $28,384 | Implemented |
UW2407 # 03 Y:2024 | 03 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $207,284 | $100 | Implemented |
UW2407 # 06 Y:2024 | 06 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,140 | $14,800 | Not Implemented |
UW2407 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $69,227 | $25,000 | Implemented |
UW2405 # 04 Y:2024 | 04 | 2024 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $150,000 | $200,000 | Not Implemented |