IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

311

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0066 # 01 Y:2003 01 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $29,101 $28,080 Implemented
TA0066 # 04 Y:2003 04 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,240 $3,740 Not Implemented
TA0066 # 06 Y:2003 06 2003 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $630 $210 Not Implemented
TA0066 # 05 Y:2003 05 2003 REPAIR AND ELIMINATE STEAM LEAKS $893 $0 Implemented
TA0066 # 02 Y:2003 02 2003 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $2,218 $0 Implemented
TA0066 # 08 Y:2003 08 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $557 $0 Not Implemented
TA0066 # 03 Y:2003 03 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,854 $0 Implemented
TA0066 # 07 Y:2003 07 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $668 $0 Implemented
TA0066 # 09 Y:2003 09 2003 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $184 $270 Not Implemented
GT0771 # 05 Y:2003 05 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $28,826 $1,248 Not Implemented
GT0771 # 10 Y:2003 10 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,823 $0 Not Implemented
GT0771 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $29,561 $12,093 Not Implemented
GT0771 # 08 Y:2003 08 2003 COVER OPEN TANKS $23,765 $700 Not Implemented
GT0771 # 07 Y:2003 07 2003 COVER OPEN TANKS $2,447 $3,500 Not Implemented
GT0771 # 06 Y:2003 06 2003 COVER OPEN TANKS $3,255 $3,703 Not Implemented
GT0771 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,260 $1,050 Implemented
GT0771 # 01 Y:2003 01 2003 COMBINE UTILITY METERS $3,600 $0 Implemented
GT0771 # 03 Y:2003 03 2003 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $882 $650 Implemented
GT0771 # 02 Y:2003 02 2003 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $17,568 $23,870 Implemented
OK0672 # 07 Y:2003 07 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,225 $262 Implemented
OK0672 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,041 $0 Not Implemented
OK0672 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,952 $28,902 Not Implemented
OK0672 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,333 $145 Not Implemented
OK0672 # 06 Y:2003 06 2003 OPTIMIZE PLANT POWER FACTOR $1,292 $8,190 Not Implemented
OK0672 # 02 Y:2003 02 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $28,340 $0 Not Implemented