IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

277

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0882 # 04 Y:2011 04 2011 METER WASTE WATER $3,614 $6,000 Not Implemented
GT0882 # 05 Y:2011 05 2011 UPGRADE CONTROLS ON COMPRESSORS $16,076 $55,000 Implemented
GT0882 # 06 Y:2011 06 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $31,792 $136,000 Implemented
GT0882 # 07 Y:2011 07 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $17,800 $38,640 Implemented
GT0882 # 08 Y:2011 08 2011 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $85,358 $222,000 Not Implemented
GT0882 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,117 $155,150 Implemented
DL0073 # 01 Y:2011 01 2011 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $904,000 $2,850,000 Not Implemented
DL0073 # 02 Y:2011 02 2011 REPLACE BOILER $420,000 $408,000 Not Implemented
DL0073 # 03 Y:2011 03 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $19,700 $6,400 Not Implemented
UA0061 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $223,288 $22,500 Implemented
UA0061 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $224,396 $387,720 Not Implemented
UA0061 # 03 Y:2011 03 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,256 $85,000 Not Implemented
UA0061 # 04 Y:2011 04 2011 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $98,700 $112,800 Not Implemented
UA0061 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $164,422 $19,809 Not Implemented
UA0061 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $411,224 $71,550 Not Implemented
GT0881 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,620 $15,500 Implemented
GT0881 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,731 $0 Not Implemented
GT0881 # 03 Y:2011 03 2011 INSTALL COMMON HEADER ON COMPRESSORS $2,800 $3,200 Not Implemented
GT0881 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,921 $21,722 Not Implemented
GT0881 # 05 Y:2011 05 2011 DISCONNECT BALLASTS $588 $0 Not Implemented
GT0881 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,188 $38,276 Not Implemented
GT0881 # 07 Y:2011 07 2011 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $38,551 $150,000 Not Implemented
GT0881 # 08 Y:2011 08 2011 COMBINE UTILITY METERS $14,342 $10,000 Implemented
BD0392 # 01 Y:2011 01 2011 USE RADIANT HEATER FOR SPOT HEATING $9,888 $5,500 Not Implemented
BD0392 # 02 Y:2011 02 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $20,276 $73,000 Not Implemented