IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

260

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0381 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,688 $4,905 Implemented
MI0381 # 01 Y:2020 01 2020 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $23,304 $57,960 Not Implemented
MI0381 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,914 $860 Implemented
MI0381 # 06 Y:2020 06 2020 KEEP BOILER TUBES CLEAN $2,320 $3,500 Not Implemented
CL2016 # 05 Y:2020 05 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $967 $400 Not Implemented
CL2016 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,257 $43,750 Not Implemented
CL2016 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,376 $1,720 Implemented
CL2016 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $5,838 $656 Implemented
CL2016 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,588 $3,733 Implemented
CL2016 # 06 Y:2020 06 2020 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $797 $0 Implemented
CL2016 # 07 Y:2020 07 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $567 $0 Implemented
CL2016 # 08 Y:2020 08 2020 RECOVER WASTE HEAT FROM EQUIPMENT $4,055 $2,500 Implemented
IP0142 # 07 Y:2020 07 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $804 $728 Implemented
IP0142 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $146 $100 Not Implemented
IP0142 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $402 $200 Not Implemented
IP0142 # 01 Y:2020 01 2020 PAY BILLS ON TIME TO AVOID LATE FEES $580 $0 Not Implemented
IP0142 # 11 Y:2020 11 2020 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $5,902 $22,000 Not Implemented
IP0142 # 10 Y:2020 10 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,597 $14,185 Implemented
IP0142 # 08 Y:2020 08 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,803 $8,000 Not Implemented
IP0142 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $14,194 $1,910 Not Implemented
IP0142 # 02 Y:2020 02 2020 COMBINE UTILITY METERS $494 $0 Implemented
IP0142 # 09 Y:2020 09 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $25 $40 Not Implemented
IP0142 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $94 $40 Implemented
NC0655 # 03 Y:2020 03 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,039 $500 Not Implemented
NC0655 # 02 Y:2020 02 2020 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $49,654 $612,000 Not Implemented