IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 3361 Motor Vehicle Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0235 # 07 Y:2021 07 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,137 $81 Implemented
UA0235 # 06 Y:2021 06 2021 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,383 $708 Not Implemented
UA0235 # 05 Y:2021 05 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $26,697 $150 Implemented
UA0235 # 04 Y:2021 04 2021 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,001 $808 Implemented
UA0235 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,979 $2,094 Implemented
UA0235 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $16,096 $8,577 Not Implemented
UA0235 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,903 $5,078 Not Implemented
UA0185 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,414 $4,645 Implemented
UA0185 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,091 $500 Not Implemented
UA0185 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $342 $85 Implemented
UA0185 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,372 $25,579 Not Implemented
UA0185 # 03 Y:2017 03 2017 INSTALL TIMERS AND/OR THERMOSTATS $9,904 $900 Not Implemented
UA0185 # 02 Y:2017 02 2017 USE PHOTOCELL CONTROLS $1,034 $830 Implemented
UA0174 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,033 $42,204 Not Implemented
UA0174 # 05 Y:2017 05 2017 USE OPTIMUM TEMPERATURE $33,738 $8,460 Implemented
UA0174 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $221 $564 Implemented
UA0174 # 03 Y:2017 03 2017 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $49,747 $100,000 Not Implemented
UA0174 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,405 $588 Implemented
UA0174 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $435,778 $988,290 Not Implemented
UA0174 # 06 Y:2017 06 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $826 $2,820 Implemented
UA0061 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $164,422 $19,809 Not Implemented
UA0061 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $411,224 $71,550 Not Implemented
UA0061 # 04 Y:2011 04 2011 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $98,700 $112,800 Not Implemented
UA0061 # 03 Y:2011 03 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,256 $85,000 Not Implemented
UA0061 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $224,396 $387,720 Not Implemented