IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

342

matching recommendations
Reset
NAICS 3361 Motor Vehicle Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0941 # 09 Y:2016 09 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $930 $2,000 Not Implemented
UD0941 # 10 Y:2016 10 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $645 $0 Implemented
UD0941 # 11 Y:2016 11 2016 USE RADIANT HEATER FOR SPOT HEATING $4,035 $3,850 Not Implemented
UD0941 # 12 Y:2016 12 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,616 $11,550 Not Implemented
UD0941 # 13 Y:2016 13 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,165 $35,457 Implemented
UD0941 # 14 Y:2016 14 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,738 $14,851 Implemented
CO0717 # 01 Y:2015 01 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,160 $2,130 n/a
CO0717 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $470 $480 n/a
CO0717 # 03 Y:2015 03 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $380 $100 n/a
CO0717 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,880 $35,080 n/a
CO0717 # 05 Y:2015 05 2015 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $3,660 $13,800 n/a
CO0717 # 06 Y:2015 06 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,270 $1,000 n/a
CO0717 # 07 Y:2015 07 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,080 $3,220 n/a
SU0387 # 01 Y:2015 01 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,803 $0 Not Implemented
SU0387 # 02 Y:2015 02 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,211 $0 Not Implemented
SU0387 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $988 $858 Not Implemented
SU0387 # 04 Y:2015 04 2015 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $15,923 $25,000 Not Implemented
SU0387 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $776 $1,546 Not Implemented
SU0387 # 06 Y:2015 06 2015 MAKE A NEW BY-PRODUCT $20,522 $100,000 Not Implemented
NC0527 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $101,147 $140,860 Implemented
NC0527 # 02 Y:2014 02 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $23,485 $5,000 Implemented
NC0527 # 03 Y:2014 03 2014 REPLACE BOILER $32,235 $90,000 Not Implemented
NC0527 # 04 Y:2014 04 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,800 $33,000 Not Implemented
NC0527 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,403 $100 Implemented
NC0527 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,883 $10,000 Not Implemented