Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsNAICS | 3361 | Motor Vehicle Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0608 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,445 | $25,640 | n/a |
UF0608 # 03 Y:2023 | 03 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,437 | $3,636 | n/a |
UF0608 # 04 Y:2023 | 04 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,417 | $9,340 | n/a |
UF0608 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,526 | $10,560 | n/a |
UF0608 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,789 | $7,200 | n/a |
UF0608 # 07 Y:2023 | 07 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $1,138 | $5,400 | n/a |
UF0608 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $100,291 | $322,608 | n/a |
WV0654 # 10 Y:2023 | 10 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $648 | $3,230 | Implemented |
WV0654 # 09 Y:2023 | 09 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $951 | $330 | Not Implemented |
WV0654 # 08 Y:2023 | 08 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,093 | $1,113 | Implemented |
WV0654 # 07 Y:2023 | 07 | 2023 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,242 | $6,000 | Implemented |
WV0654 # 06 Y:2023 | 06 | 2023 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $1,462 | $5,940 | Not Implemented |
WV0654 # 05 Y:2023 | 05 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $3,551 | $9,700 | Implemented |
WV0654 # 04 Y:2023 | 04 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,126 | $9,645 | Implemented |
WV0654 # 03 Y:2023 | 03 | 2023 | REDUCE VENTILATION AIR | $5,594 | $13,814 | Not Implemented |
WV0654 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,126 | $3,800 | Implemented |
WV0654 # 01 Y:2023 | 01 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,942 | $63,000 | Not Implemented |
WV0654 # 11 Y:2023 | 11 | 2023 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $612 | $1,300 | Not Implemented |
WV0654 # 12 Y:2023 | 12 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $554 | $150 | Implemented |
WV0654 # 16 Y:2023 | 16 | 2023 | INSULATE BARE EQUIPMENT | $190 | $98 | Implemented |
WV0654 # 17 Y:2023 | 17 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $176 | $240 | Implemented |
WV0654 # 13 Y:2023 | 13 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $493 | $1,500 | Implemented |
WV0654 # 14 Y:2023 | 14 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $282 | $1,370 | Implemented |
WV0654 # 15 Y:2023 | 15 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $226 | $970 | Not Implemented |
WV0641 # 06 Y:2023 | 06 | 2023 | REDUCE VENTILATION AIR | $16,843 | $4,400 | Implemented |