Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
166
matching recommendationsNAICS | 33611 | Automobile and Light Duty Motor Vehicle Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1107 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $1,278 | $792 | n/a |
OK1107 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,963 | $3,416 | n/a |
OK1107 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,761 | $0 | n/a |
OK1107 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $33,098 | $353,808 | n/a |
OK1107 # 02 Y:2024 | 02 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $99,540 | $804,825 | n/a |
OK1107 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,461 | $20,075 | n/a |
OK1107 # 07 Y:2024 | 07 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $461 | $354 | n/a |
OK1107 # 08 Y:2024 | 08 | 2024 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,517 | $1,048 | n/a |
UF0608 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,789 | $7,200 | Implemented |
UF0608 # 04 Y:2023 | 04 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,417 | $9,340 | Implemented |
UF0608 # 03 Y:2023 | 03 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,437 | $3,636 | Implemented |
UF0608 # 07 Y:2023 | 07 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $1,138 | $5,400 | Implemented |
UF0608 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,526 | $10,560 | Implemented |
UF0608 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $100,291 | $322,608 | Not Implemented |
UF0608 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,445 | $25,640 | Not Implemented |
TT0273 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,155 | $2,860 | Implemented |
TT0273 # 07 Y:2022 | 07 | 2022 | INSULATE BARE EQUIPMENT | $1,084 | $428 | Not Implemented |
TT0273 # 11 Y:2022 | 11 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $356 | $700 | Implemented |
TT0273 # 06 Y:2022 | 06 | 2022 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,707 | $400 | Not Implemented |
TT0273 # 10 Y:2022 | 10 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $633 | $1,500 | Not Implemented |
TT0273 # 08 Y:2022 | 08 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,072 | $1,926 | Implemented |
TT0273 # 05 Y:2022 | 05 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,192 | $2,000 | Not Implemented |
TT0273 # 01 Y:2022 | 01 | 2022 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $197,305 | $1,241,200 | Not Implemented |
TT0273 # 03 Y:2022 | 03 | 2022 | INSULATE BARE EQUIPMENT | $51,693 | $8,551 | Not Implemented |
TT0273 # 02 Y:2022 | 02 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $65,016 | $5,000 | Implemented |