Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
173
matching recommendationsNAICS | 33611 | Automobile and Light Duty Motor Vehicle Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0369 # 06 Y:2025 | 06 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,987 | $1,000 | n/a |
MZ0369 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,599 | $7,900 | n/a |
MZ0369 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $23,108 | $9,760 | n/a |
MZ0369 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $62,544 | $926,250 | n/a |
MZ0369 # 02 Y:2025 | 02 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $3,668 | $35,570 | n/a |
MZ0369 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,842 | $16,170 | n/a |
MZ0369 # 07 Y:2025 | 07 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,940 | $870 | n/a |
OK1107 # 08 Y:2024 | 08 | 2024 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,517 | $1,048 | Not Implemented |
OK1107 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $1,278 | $792 | Not Implemented |
OK1107 # 07 Y:2024 | 07 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $461 | $354 | Not Implemented |
OK1107 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,963 | $3,416 | Not Implemented |
OK1107 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $33,098 | $353,808 | Not Implemented |
OK1107 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,761 | $0 | Not Implemented |
OK1107 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,461 | $20,075 | Not Implemented |
OK1107 # 02 Y:2024 | 02 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $99,540 | $804,825 | Not Implemented |
UF0608 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,789 | $7,200 | Implemented |
UF0608 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,445 | $25,640 | Not Implemented |
UF0608 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $100,291 | $322,608 | Not Implemented |
UF0608 # 03 Y:2023 | 03 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,437 | $3,636 | Implemented |
UF0608 # 04 Y:2023 | 04 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,417 | $9,340 | Implemented |
UF0608 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,526 | $10,560 | Implemented |
UF0608 # 07 Y:2023 | 07 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $1,138 | $5,400 | Implemented |
TT0273 # 08 Y:2022 | 08 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,072 | $1,926 | Implemented |
TT0273 # 09 Y:2022 | 09 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $780 | $2,250 | Not Implemented |
TT0273 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,155 | $2,860 | Implemented |