IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

128

matching recommendations
Reset
NAICS 336111 Automobile Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1107 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $1,278 $792 n/a
OK1107 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,963 $3,416 n/a
OK1107 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,761 $0 n/a
OK1107 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $33,098 $353,808 n/a
OK1107 # 02 Y:2024 02 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $99,540 $804,825 n/a
OK1107 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,461 $20,075 n/a
OK1107 # 07 Y:2024 07 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $461 $354 n/a
OK1107 # 08 Y:2024 08 2024 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,517 $1,048 n/a
UF0608 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,789 $7,200 n/a
UF0608 # 04 Y:2023 04 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,417 $9,340 n/a
UF0608 # 03 Y:2023 03 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,437 $3,636 n/a
UF0608 # 07 Y:2023 07 2023 UPGRADE CONTROLS ON COMPRESSORS $1,138 $5,400 n/a
UF0608 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,526 $10,560 n/a
UF0608 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $100,291 $322,608 n/a
UF0608 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,445 $25,640 n/a
TT0273 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,155 $2,860 Implemented
TT0273 # 07 Y:2022 07 2022 INSULATE BARE EQUIPMENT $1,084 $428 Not Implemented
TT0273 # 11 Y:2022 11 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $356 $700 Implemented
TT0273 # 06 Y:2022 06 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,707 $400 Not Implemented
TT0273 # 10 Y:2022 10 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $633 $1,500 Not Implemented
TT0273 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,072 $1,926 Implemented
TT0273 # 05 Y:2022 05 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,192 $2,000 Not Implemented
TT0273 # 01 Y:2022 01 2022 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $197,305 $1,241,200 Not Implemented
TT0273 # 03 Y:2022 03 2022 INSULATE BARE EQUIPMENT $51,693 $8,551 Not Implemented
TT0273 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $65,016 $5,000 Implemented