IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

162

matching recommendations
Reset
NAICS 33612 Heavy Duty Truck Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0620 # 01 Y:2022 01 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,903 $67,984 Not Implemented
WV0620 # 02 Y:2022 02 2022 USE EVAPORATION TO CONCENTRATE MATERIAL $9,086 $4,900 Not Implemented
WV0620 # 03 Y:2022 03 2022 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $7,597 $37,000 Not Implemented
WV0620 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,233 $660 Implemented
WV0620 # 05 Y:2022 05 2022 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $4,159 $8,300 Not Implemented
WV0620 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,394 $7,905 Implemented
WV0620 # 07 Y:2022 07 2022 OPTIMIZE PLANT POWER FACTOR $2,785 $7,090 Implemented
WV0620 # 08 Y:2022 08 2022 UPGRADE CONTROLS ON COMPRESSORS $2,669 $3,970 Not Implemented
WV0620 # 09 Y:2022 09 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,129 $1,773 Not Implemented
WV0620 # 10 Y:2022 10 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,028 $9,280 Not Implemented
UF0572 # 08 Y:2022 08 2022 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $5,635 $4,650 Implemented
UF0572 # 07 Y:2022 07 2022 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $12,245 $11,975 Implemented
UF0572 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,414 $756 Implemented
UF0572 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $4,007 $8,760 Implemented
UF0572 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,152 $3,218 Implemented
UF0572 # 03 Y:2022 03 2022 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $4,159 $10,627 Implemented
UF0572 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $27,950 $26,859 Implemented
UF0572 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $56,857 $359,360 Implemented
NC0655 # 04 Y:2020 04 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $310 $500 Implemented
NC0655 # 03 Y:2020 03 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,039 $500 Not Implemented
NC0655 # 02 Y:2020 02 2020 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $49,654 $612,000 Not Implemented
NC0655 # 01 Y:2020 01 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $92,988 $168,000 Not Implemented
UA0185 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,414 $4,645 Implemented
UA0185 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $342 $85 Implemented
UA0185 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,091 $500 Not Implemented