Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
169
matching recommendationsNAICS | 336120 | Heavy Duty Truck Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0445 # 01 Y:2025 | 01 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $17,535 | $200,000 | n/a |
MS0445 # 06 Y:2025 | 06 | 2025 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,573 | $2,502 | n/a |
MS0445 # 04 Y:2025 | 04 | 2025 | AIR CONDITION ONLY SPACE NECESSARY | $40,482 | $25,536 | n/a |
MS0445 # 02 Y:2025 | 02 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $8,629 | $44,500 | n/a |
MS0445 # 07 Y:2025 | 07 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $27,723 | $35,999 | n/a |
MS0445 # 03 Y:2025 | 03 | 2025 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $395 | $0 | n/a |
MS0445 # 05 Y:2025 | 05 | 2025 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $12,178 | $45,000 | n/a |
WV0654 # 13 Y:2023 | 13 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $493 | $1,500 | Implemented |
WV0654 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,126 | $3,800 | Implemented |
WV0654 # 04 Y:2023 | 04 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,126 | $9,645 | Implemented |
WV0654 # 09 Y:2023 | 09 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $951 | $330 | Not Implemented |
WV0654 # 06 Y:2023 | 06 | 2023 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $1,462 | $5,940 | Not Implemented |
WV0654 # 07 Y:2023 | 07 | 2023 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,242 | $6,000 | Implemented |
WV0654 # 10 Y:2023 | 10 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $648 | $3,230 | Implemented |
WV0654 # 11 Y:2023 | 11 | 2023 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $612 | $1,300 | Not Implemented |
WV0654 # 08 Y:2023 | 08 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,093 | $1,113 | Implemented |
WV0654 # 16 Y:2023 | 16 | 2023 | INSULATE BARE EQUIPMENT | $190 | $98 | Implemented |
WV0654 # 14 Y:2023 | 14 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $282 | $1,370 | Implemented |
WV0654 # 03 Y:2023 | 03 | 2023 | REDUCE VENTILATION AIR | $5,594 | $13,814 | Not Implemented |
WV0654 # 05 Y:2023 | 05 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $3,551 | $9,700 | Implemented |
WV0654 # 01 Y:2023 | 01 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,942 | $63,000 | Not Implemented |
WV0654 # 15 Y:2023 | 15 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $226 | $970 | Not Implemented |
WV0654 # 12 Y:2023 | 12 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $554 | $150 | Implemented |
WV0654 # 17 Y:2023 | 17 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $176 | $240 | Implemented |
WV0641 # 06 Y:2023 | 06 | 2023 | REDUCE VENTILATION AIR | $16,843 | $4,400 | Implemented |