Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
627
matching recommendationsNAICS | 3362 | Motor Vehicle Body and Trailer Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0364 # 04 Y:2009 | 04 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $327 | $0 | Not Implemented |
BD0364 # 05 Y:2009 | 05 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $118 | $500 | Not Implemented |
BD0364 # 06 Y:2009 | 06 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $193 | $300 | Not Implemented |
BD0364 # 07 Y:2009 | 07 | 2009 | USE RADIANT HEATER FOR SPOT HEATING | $4,732 | $8,000 | Not Implemented |
BD0364 # 08 Y:2009 | 08 | 2009 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,047 | $800 | Not Implemented |
BD0364 # 09 Y:2009 | 09 | 2009 | MODIFY STARTUP/SHUTDOWN TIMES | $418 | $0 | Not Implemented |
BD0357 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,370 | $7,650 | Not Implemented |
BD0357 # 02 Y:2009 | 02 | 2009 | INSTALL OCCUPANCY SENSORS | $389 | $300 | Implemented |
BD0357 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $245 | $225 | Not Implemented |
BD0357 # 04 Y:2009 | 04 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $143 | $450 | Not Implemented |
BD0357 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $600 | $0 | Implemented |
BD0357 # 06 Y:2009 | 06 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,672 | $1,000 | Implemented |
BD0357 # 07 Y:2009 | 07 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $319 | $1,300 | Not Implemented |
BD0357 # 08 Y:2009 | 08 | 2009 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,111 | $0 | Implemented |
BD0357 # 09 Y:2009 | 09 | 2009 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $2,813 | $6,500 | Not Implemented |
BD0357 # 10 Y:2009 | 10 | 2009 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,905 | $0 | Implemented |
UF0420 # 01 Y:2009 | 01 | 2009 | PAY UTILITY BILLS ON TIME | $10,674 | $0 | Not Implemented |
UF0420 # 02 Y:2009 | 02 | 2009 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $5,219 | $2,785 | Not Implemented |
UF0420 # 03 Y:2009 | 03 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $30,946 | $12,360 | Not Implemented |
UF0420 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,121 | $39,435 | Not Implemented |
UF0420 # 05 Y:2009 | 05 | 2009 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $5,022 | $10,000 | Not Implemented |
UF0420 # 06 Y:2009 | 06 | 2009 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $21,915 | $607 | Not Implemented |
UF0420 # 07 Y:2009 | 07 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,325 | $900 | Not Implemented |
UF0420 # 08 Y:2009 | 08 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,248 | $0 | Not Implemented |
UF0420 # 09 Y:2009 | 09 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $13,954 | $3,000 | Not Implemented |