Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2009 |
Principal Product | Door Trim Modules |
NAICS | 336211 - Motor Vehicle Body Manufacturing |
SIC | 3711 - Motor Vehicles And Car Bodies |
Sales | $100,000,000-$500,000,000 |
# of Employees | 125 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 280,000 Pieces |
Production Hrs. Annual | 2,080 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $65,515 | 896,888 | kWh | $0.07 |
Electricity Demand | $10,364 | 2,069 | kW-months/year | $5.01 |
Electricity Fees | $6,794 | - | $ | - |
Natural Gas | $30,878 | 3,178 | MMBtu | $9.72 |
TOTAL ENERGY COSTS | $113,551 | |||
RECOMMENDED SAVINGS* | $14,567 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,677 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Raw Material | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,370 Cost: $7,650 |
$2,977 | 39,749 | $1,149 | 229 | - | - | $244 | - |
$2,977 39,749 kWh |
$1,149 229 kW-months/year |
- - lb |
$244 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $389 Cost: $300 |
$268 | 3,581 | $121 | 24 | - | - | - | - |
$268 3,581 kWh |
$121 24 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $245 Cost: $225 |
$150 | 1,997 | $12 | 2 | - | - | $83 | - |
$150 1,997 kWh |
$12 2 kW-months/year |
- - lb |
$83 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $143 Cost: $450 |
$103 | 1,378 | $40 | 8 | - | - | - | - |
$103 1,378 kWh |
$40 8 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $600 Cost: - |
$460 | 6,145 | $140 | 28 | - | - | - | - |
$460 6,145 kWh |
$140 28 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,672 Cost: $1,000 |
$1,964 | 26,223 | $708 | 141 | - | - | - | - |
$1,964 26,223 kWh |
$708 141 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $319 Cost: $1,300 |
$230 | 3,070 | $89 | 18 | - | - | - | - |
$230 3,070 kWh |
$89 18 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $1,111 Cost: - |
$437 | 5,829 | $674 | 135 | - | - | - | - |
$437 5,829 kWh |
$674 135 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $2,813 Cost: $6,500 |
- | - | - | - | $2,813 | 132,057 | - | - |
- - kWh |
- - kW-months/year |
$2,813 132,057 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $1,905 Cost: - |
- | - | $1,905 | 380 | - | - | - | - |
- - kWh |
$1,905 380 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $14,567 Cost: $17,425 |
$6,589 | 87,972 | $4,838 | 965 | $2,813 | 132,057 | $327 | - | $6,589 87,972 kWh |
$4,838 965 kW-months/year |
$2,813 132,057 lb |
$327 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,677 Cost: $1,300 |
$3,129 | 41,778 | $3,548 | 708 | - | - | - | - | $3,129 41,778 kWh |
$3,548 708 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Raw Material | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Raw Material |