Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
100
matching recommendationsNAICS | 3362 | Motor Vehicle Body and Trailer Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0490 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,883 | $16,722 | Implemented |
WV0490 # 10 Y:2014 | 10 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $381 | $51 | Not Implemented |
WV0490 # 09 Y:2014 | 09 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $701 | $1,075 | Not Implemented |
WV0490 # 08 Y:2014 | 08 | 2014 | REPLACE BOILER | $1,367 | $5,170 | Implemented |
WV0490 # 01 Y:2014 | 01 | 2014 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $10,882 | $5,000 | Implemented |
WV0490 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,569 | $3,905 | Implemented |
UM0418 # 03 Y:2012 | 03 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $151,000 | $60,000 | Not Implemented |
UM0418 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,257 | $7,500 | Not Implemented |
UM0418 # 01 Y:2012 | 01 | 2012 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $795,000 | $1,715,000 | Not Implemented |
UM0418 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,459 | $84,630 | Implemented |
WV0388 # 07 Y:2009 | 07 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,366 | $3,122 | Implemented |
WV0388 # 13 Y:2009 | 13 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $246 | $400 | Not Implemented |
WV0388 # 12 Y:2009 | 12 | 2009 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $282 | $590 | Not Implemented |
WV0388 # 11 Y:2009 | 11 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $321 | $0 | Not Implemented |
WV0388 # 10 Y:2009 | 10 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $749 | $572 | Not Implemented |
WV0388 # 09 Y:2009 | 09 | 2009 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,757 | $4,680 | Not Implemented |
WV0388 # 08 Y:2009 | 08 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,801 | $34 | Implemented |
WV0388 # 06 Y:2009 | 06 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,424 | $6,259 | Implemented |
WV0388 # 05 Y:2009 | 05 | 2009 | DEVELOP A REPAIR/REPLACE POLICY | $2,746 | $560 | Implemented |
WV0388 # 04 Y:2009 | 04 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,130 | $1,763 | Implemented |
WV0388 # 03 Y:2009 | 03 | 2009 | INSTALL OCCUPANCY SENSORS | $3,159 | $1,876 | Implemented |
WV0388 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,117 | $51,755 | Implemented |
WV0388 # 01 Y:2009 | 01 | 2009 | USE RADIANT HEATER FOR SPOT HEATING | $48,632 | $54,244 | Not Implemented |
UD0764 # 07 Y:2007 | 07 | 2007 | INSTALL OCCUPANCY SENSORS | $3,230 | $760 | Implemented |
UD0764 # 06 Y:2007 | 06 | 2007 | INSTALL REPLACEMENT DOORS | $6,223 | $13,000 | Not Implemented |