IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

420

matching recommendations
Reset
NAICS 336211 Motor Vehicle Body Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0431 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $25,011 $30,000 Implemented
UM0431 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,730 $38,000 Not Implemented
UM0431 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,100 $200 Not Implemented
UM0431 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,832 $2,500 Not Implemented
MZ0125 # 01 Y:2013 01 2013 INSTALL OCCUPANCY SENSORS $1,108 $480 Implemented
MZ0125 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,168 $9,300 Implemented
MZ0125 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,107 $1,300 Implemented
UA0095 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,807 $4,500 Not Implemented
UA0095 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,789 $800 Not Implemented
UA0095 # 03 Y:2013 03 2013 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $18,583 $59,040 Not Implemented
UA0095 # 04 Y:2013 04 2013 DISCONNECT BALLASTS $573 $324 Not Implemented
UA0095 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $562 $1,759 Not Implemented
UM0418 # 01 Y:2012 01 2012 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $795,000 $1,715,000 Not Implemented
UM0418 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,459 $84,630 Implemented
UM0418 # 03 Y:2012 03 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $151,000 $60,000 Not Implemented
UM0418 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $7,257 $7,500 Not Implemented
UM0405 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,384 $2,000 Not Implemented
UM0405 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,465 $1,400 Implemented
UM0404 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,642 $3,000 Not Implemented
UM0404 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,960 $200 Not Implemented
UM0404 # 03 Y:2012 03 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,071 $10 Not Implemented
UM0404 # 04 Y:2012 04 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,767 $36,000 Not Implemented
BD0384 # 01 Y:2011 01 2011 USE RADIANT HEATER FOR SPOT HEATING $50,720 $73,600 Implemented
BD0384 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,663 $45,984 Implemented
BD0384 # 03 Y:2011 03 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $13,232 $3,000 Not Implemented