IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
NAICS 336211 Motor Vehicle Body Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0533 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $597 $2,226 Not Implemented
IA0533 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $993 $1,342 Implemented
IA0533 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,994 $4,066 Implemented
IA0533 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $2,294 $2,575 Not Implemented
IA0533 # 04 Y:2015 04 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,136 $210 Implemented
IA0533 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,225 $7,848 Implemented
IA0533 # 02 Y:2015 02 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,005 $1,049 Implemented
IA0533 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,857 $19,775 Implemented
IA0449 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,171 $500 Implemented
IA0449 # 01 Y:2010 01 2010 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $13,384 $500 Not Implemented
IA0449 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,181 $650 Implemented
IA0449 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,025 $28,980 Implemented
IA0449 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $229 $1,199 Implemented
IA0449 # 06 Y:2010 06 2010 INSULATE BARE EQUIPMENT $5,734 $1,910 Implemented
IA0449 # 07 Y:2010 07 2010 COVER OPEN TANKS $8,215 $6,350 Not Implemented
IA0367 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $443 $52 Implemented
IA0367 # 12 Y:2005 12 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,745 $28,000 Not Implemented
IA0367 # 11 Y:2005 11 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,202 $1,640 Not Implemented
IA0367 # 10 Y:2005 10 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,781 $500 Not Implemented
IA0367 # 09 Y:2005 09 2005 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $8,580 $14,000 Not Implemented
IA0367 # 08 Y:2005 08 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $11,267 $14,500 Not Implemented
IA0367 # 07 Y:2005 07 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $650 $1,270 Implemented
IA0367 # 06 Y:2005 06 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $650 $1,840 Implemented
IA0367 # 05 Y:2005 05 2005 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $20,800 $1,046 Implemented
IA0367 # 04 Y:2005 04 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $9,149 $0 Implemented