Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
60
matching recommendationsNAICS | 336211 | Motor Vehicle Body Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0649 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $10,514 | $13,660 | Not Implemented |
WV0649 # 08 Y:2023 | 08 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $6,156 | $1,439 | Implemented |
WV0649 # 09 Y:2023 | 09 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,697 | $13,390 | Implemented |
WV0649 # 02 Y:2023 | 02 | 2023 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $13,485 | $18,440 | Not Implemented |
WV0649 # 13 Y:2023 | 13 | 2023 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $740 | $2,930 | Not Implemented |
WV0649 # 10 Y:2023 | 10 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,665 | $407 | Implemented |
WV0649 # 07 Y:2023 | 07 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,255 | $3,000 | Implemented |
WV0649 # 01 Y:2023 | 01 | 2023 | INSULATE BARE EQUIPMENT | $19,114 | $9,160 | Implemented |
WV0649 # 06 Y:2023 | 06 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,203 | $4,464 | Not Implemented |
WV0649 # 14 Y:2023 | 14 | 2023 | INSTALL OCCUPANCY SENSORS | $283 | $608 | Implemented |
WV0649 # 11 Y:2023 | 11 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,381 | $528 | Implemented |
WV0649 # 05 Y:2023 | 05 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $9,620 | $1,500 | Implemented |
WV0649 # 04 Y:2023 | 04 | 2023 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $10,248 | $20,166 | Not Implemented |
WV0649 # 12 Y:2023 | 12 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $747 | $2,233 | Not Implemented |
UD1006 # 02 Y:2019 | 02 | 2019 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $125,929 | $30,000 | Not Implemented |
UD1006 # 06 Y:2019 | 06 | 2019 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $7,275 | $16,696 | Not Implemented |
UD1006 # 05 Y:2019 | 05 | 2019 | INSULATE BARE EQUIPMENT | $8,839 | $3,770 | Not Implemented |
UD1006 # 04 Y:2019 | 04 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $50,796 | $0 | Not Implemented |
UD1006 # 03 Y:2019 | 03 | 2019 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $27,201 | $54,202 | Not Implemented |
UD1006 # 01 Y:2019 | 01 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $44,647 | $16,500 | Implemented |
WV0562 # 03 Y:2018 | 03 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,359 | $2,000 | Implemented |
WV0562 # 01 Y:2018 | 01 | 2018 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $284,971 | $600,000 | Not Implemented |
WV0562 # 02 Y:2018 | 02 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,104 | $80,009 | Not Implemented |
WV0562 # 05 Y:2018 | 05 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $6,713 | $703 | Implemented |
WV0562 # 06 Y:2018 | 06 | 2018 | INSULATE BARE EQUIPMENT | $2,979 | $1,328 | Implemented |