IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0861 # 11 Y:2013 11 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $65,536 $250,000 Not Implemented
OK0861 # 04 Y:2013 04 2013 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $834 $3,110 Not Implemented
OK0861 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,425 $1,378 Not Implemented
OK0861 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,478 $1,026 Not Implemented
OK0861 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,427 $1,250 Implemented
OK0861 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,689 $13,383 Not Implemented
OK0861 # 10 Y:2013 10 2013 UTILIZE A LESS EXPENSIVE COOLING METHOD $53,906 $518,400 Not Implemented
OK0861 # 08 Y:2013 08 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $960 $1,500 Not Implemented
OK0861 # 09 Y:2013 09 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $12,086 $2,710 Not Implemented
OK0861 # 07 Y:2013 07 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $22,838 $54,080 Not Implemented
OK0861 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $377 $9,558 Not Implemented
OK0762 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $164,842 $297,920 Implemented
OK0762 # 02 Y:2008 02 2008 INSTALL SKYLIGHTS $14,224 $54,912 Implemented
OK0762 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,433 $104,000 Not Implemented
OK0762 # 04 Y:2008 04 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,975 $8,646 Not Implemented
OK0762 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,605 $1,000 Implemented
OK0762 # 06 Y:2008 06 2008 PREHEAT COMBUSTION AIR WITH WASTE HEAT $238,891 $232,766 Implemented
OK0762 # 07 Y:2008 07 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $17,165 $0 Implemented
OK0702 # 03 Y:2005 03 2005 INSTALL OCCUPANCY SENSORS $1,148 $582 Not Implemented
OK0702 # 04 Y:2005 04 2005 INSTALL SET-BACK TIMERS $896 $1,540 Not Implemented
OK0702 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $234 $530 Implemented
OK0702 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $725 $480 Not Implemented
OK0702 # 07 Y:2005 07 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,165 $36,140 Not Implemented
OK0702 # 02 Y:2005 02 2005 USE POWER DURING OFF-PEAK PERIODS $21,518 $6,899 Not Implemented
OK0702 # 01 Y:2005 01 2005 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $22,000 $6,600 Not Implemented