IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,360

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0146 # 12 Y:2008 12 2008 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $27,915 $32,868 Not Implemented
IC0146 # 13 Y:2008 13 2008 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,315 $0 Not Implemented
IA0433 # 01 Y:2008 01 2008 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $52,036 $0 Not Implemented
IA0433 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,622 $459 Implemented
IA0433 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,886 $832 Implemented
IA0433 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,195 $54 Implemented
IA0433 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $13,871 $1,700 Not Implemented
IA0433 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,324 $37,346 Not Implemented
IA0433 # 07 Y:2008 07 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,364 $4,000 Implemented
IA0433 # 08 Y:2008 08 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $587 $142 Implemented
IA0433 # 09 Y:2008 09 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,158 $4,624 Not Implemented
IA0433 # 10 Y:2008 10 2008 INSULATE BARE EQUIPMENT $524 $254 Not Implemented
IA0433 # 11 Y:2008 11 2008 ADJUST VENTS TO MINIMIZE ENERGY USE $3,380 $294 Implemented
SF0358 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $1,987 $0 Implemented
SF0358 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,229 $150 Not Implemented
SF0358 # 03 Y:2008 03 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $467 $0 Implemented
SF0358 # 04 Y:2008 04 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,536 $4,596 Implemented
SF0358 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $180 $97 Implemented
SF0358 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,827 $8,406 Not Implemented
SF0358 # 07 Y:2008 07 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $351 $230 Implemented
SF0358 # 08 Y:2008 08 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,224 $5,375 Implemented
SF0358 # 09 Y:2008 09 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,062 $2,259 Implemented
SF0358 # 10 Y:2008 10 2008 INSTALL OCCUPANCY SENSORS $11,328 $26,035 Not Implemented
SF0358 # 11 Y:2008 11 2008 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,117 $2,180 Not Implemented
SF0358 # 12 Y:2008 12 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $606 $2,130 Implemented