Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,360
matching recommendationsNAICS | 3363 | Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0079 # 03 Y:2004 | 03 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,240 | $300 | Not Implemented |
TA0079 # 04 Y:2004 | 04 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,490 | $200 | Implemented |
TA0079 # 05 Y:2004 | 05 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,450 | $720 | Implemented |
TA0079 # 06 Y:2004 | 06 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $637 | $0 | Not Implemented |
TA0079 # 07 Y:2004 | 07 | 2004 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $280 | $0 | Implemented |
UM0263 # 01 Y:2004 | 01 | 2004 | EXPAND OPERATIONS INTO UNUSED SPACE | $72,800 | $11,600 | Not Implemented |
UM0263 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,652 | $1,350 | Not Implemented |
UM0263 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,527 | $16,352 | Not Implemented |
UM0263 # 04 Y:2004 | 04 | 2004 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $4,280 | $9,583 | Not Implemented |
UM0263 # 05 Y:2004 | 05 | 2004 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $4,026 | $11,000 | Not Implemented |
UM0263 # 06 Y:2004 | 06 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,663 | $50 | Not Implemented |
UM0263 # 07 Y:2004 | 07 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,670 | $500 | Not Implemented |
UM0263 # 08 Y:2004 | 08 | 2004 | COVER OPEN TANKS | $912 | $100 | Not Implemented |
UM0263 # 09 Y:2004 | 09 | 2004 | INSTALL OCCUPANCY SENSORS | $880 | $3,280 | Not Implemented |
UM0263 # 10 Y:2004 | 10 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $493 | $1,100 | Not Implemented |
UM0263 # 11 Y:2004 | 11 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $261 | $1,000 | Not Implemented |
MS0255 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,124 | $23,073 | Not Implemented |
MS0255 # 02 Y:2004 | 02 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,517 | $2,756 | Not Implemented |
MS0255 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,202 | $372 | Not Implemented |
MS0255 # 04 Y:2004 | 04 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,343 | $2,164 | Not Implemented |
MS0255 # 05 Y:2004 | 05 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $5,775 | $4,524 | Not Implemented |
MS0255 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,953 | $8,984 | Not Implemented |
MS0255 # 07 Y:2004 | 07 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $1,768 | $600 | Not Implemented |
MS0255 # 08 Y:2004 | 08 | 2004 | COMBINE UTILITY METERS | $174 | $50 | Not Implemented |
WI0474 # 01 Y:2004 | 01 | 2004 | ADOPT IN-HOUSE MATERIAL GENERATION | $213,585 | $150 | Implemented |