IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,199

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0231 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $20,138 $57,000 Not Implemented
BD0231 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,777 $1,600 Implemented
BD0231 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $2,010 $2,025 Not Implemented
BD0231 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,061 $4,995 Not Implemented
BD0231 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $400 $130 Implemented
BD0231 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $113 $0 Implemented
BD0231 # 07 Y:2003 07 2003 CONVERT TO ELECTROSTATIC POWDER COATING $12,010 $17,500 Implemented
BD0231 # 08 Y:2003 08 2003 $28,875 $15,000 Implemented
BD0231 # 09 Y:2003 09 2003 $28,875 $20,000 Implemented
BD0231 # 10 Y:2003 10 2003 $6,240 $2,500 Implemented
BD0231 # 11 Y:2003 11 2003 CONTRACT A WOOD PALLET RECYCLING COMPANY $348 $1,000 Not Implemented
TA0048 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,000 $24,409 Implemented
TA0048 # 02 Y:2003 02 2003 $6,700 $82 Implemented
TA0048 # 03 Y:2003 03 2003 REPAIR AND ELIMINATE STEAM LEAKS $6,390 $1,045 Implemented
TA0048 # 04 Y:2003 04 2003 AIR CONDITION ONLY SPACE NECESSARY $6,360 $0 Implemented
TA0048 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,340 $130 Implemented
TA0048 # 06 Y:2003 06 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,083 $0 Implemented
TA0048 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $750 $0 Not Implemented
TA0048 # 08 Y:2003 08 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $745 $0 Not Implemented
TA0048 # 09 Y:2003 09 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $690 $170 Implemented
TA0048 # 10 Y:2003 10 2003 DISCONNECT BALLASTS $530 $47 Not Implemented
TA0048 # 11 Y:2003 11 2003 INSTALL OCCUPANCY SENSORS $260 $250 Not Implemented
TA0048 # 12 Y:2003 12 2003 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $200 $129 Implemented
UM0228 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $46,428 $6,000 Not Implemented
UM0228 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $4,800 $1,000 Not Implemented