IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

503

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0907 # 07 Y:2014 07 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,566 $0 Not Implemented
UD0907 # 08 Y:2014 08 2014 CONTRACT A WOOD PALLET RECYCLING COMPANY $4,440 $0 Implemented
UD0904 # 01 Y:2014 01 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,181 $0 Implemented
UD0904 # 02 Y:2014 02 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,875 $0 Implemented
UD0904 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $3,359 $450 Implemented
UD0904 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,024 $5,000 Implemented
UD0904 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $33,689 $62,131 Not Implemented
UD0904 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,892 $0 Implemented
UD0904 # 07 Y:2014 07 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $777 $384 Not Implemented
UD0904 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $66,236 $75,700 Implemented
UD0904 # 09 Y:2014 09 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,039 $0 Not Implemented
UD0904 # 10 Y:2014 10 2014 USE OPTIMUM THICKNESS INSULATION $16,866 $20,982 Implemented
UD0904 # 11 Y:2014 11 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,786 $10,400 Implemented
UD0904 # 12 Y:2014 12 2014 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $96,196 $72,000 Not Implemented
UD0904 # 13 Y:2014 13 2014 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $69,423 $62,000 Not Implemented
UD0904 # 14 Y:2014 14 2014 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $47,628 $1,300 Not Implemented
UD0889 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,100 $0 Implemented
UD0889 # 02 Y:2013 02 2013 DEVELOP A REPAIR/REPLACE POLICY $654 $460 Implemented
UD0889 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,448 $1,000 Not Implemented
UD0889 # 04 Y:2013 04 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,551 $3,500 Not Implemented
UD0889 # 05 Y:2013 05 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,355 $2,000 Not Implemented
UD0889 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,219 $7,254 Not Implemented
UD0889 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,401 $9,000 Not Implemented
UD0889 # 08 Y:2013 08 2013 INSTALL OCCUPANCY SENSORS $1,290 $1,400 Not Implemented
UD0871 # 01 Y:2012 01 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,905 $0 Not Implemented