IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,360

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2315 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,991 $5,960 Implemented
KS2315 # 02 Y:2023 02 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $33,086 $235,752 Implemented
KS2315 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,175 $24,588 Implemented
KS2315 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $4,028 $6,350 Implemented
KS2315 # 05 Y:2023 05 2023 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $545 $1,958 Not Implemented
KS2315 # 06 Y:2023 06 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $39,181 $254,691 Not Implemented
KS2315 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $57,874 $421,464 Not Implemented
NT0002 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,414 $5,801 Implemented
NT0002 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $14,389 $21,853 Not Implemented
NT0002 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,026 $2,499 Implemented
NT0002 # 04 Y:2023 04 2023 INSTALL SET-BACK TIMERS $1,504 $0 Implemented
NT0002 # 05 Y:2023 05 2023 ELIMINATE/REDUCE AN OPERATION $9,631 $0 Implemented
NT0002 # 06 Y:2023 06 2023 AUTOMATE FINISHING PROCESS $96,307 $111,000 Not Implemented
NT0002 # 07 Y:2023 07 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,880 $7,474 Implemented
UD1052 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,427 $0 Implemented
UD1052 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,718 $6,322 Not Implemented
UD1052 # 03 Y:2023 03 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $14,073 $0 Implemented
UD1052 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,488 $952 Implemented
UD1052 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $13,453 $9,000 Not Implemented
UD1052 # 06 Y:2023 06 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $34,801 $16,950 Not Implemented
IP0167 # 01 Y:2022 01 2022 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $17,520 $2,500 Not Implemented
IP0167 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,801 $3,457 Implemented
IP0167 # 03 Y:2022 03 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,573 $475 Implemented
IP0167 # 04 Y:2022 04 2022 AIR CONDITION ONLY SPACE NECESSARY $6,333 $2,520 Implemented
IP0167 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,306 $3,300 Not Implemented