IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,360

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0284 # 02 Y:2023 02 2023 MINIMIZE WATER USAGE $10,675 $240 Implemented
TT0284 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $8,764 $13,000 Implemented
TT0284 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,557 $3,205 Not Implemented
TT0284 # 05 Y:2023 05 2023 USE HEAT PUMP FOR SPACE CONDITIONING $7,905 $7,500 Not Implemented
TT0284 # 06 Y:2023 06 2023 AIR CONDITION ONLY SPACE NECESSARY $3,153 $6,000 Not Implemented
TT0284 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,804 $10,150 Implemented
TT0284 # 08 Y:2023 08 2023 OPTIMIZE PLANT POWER FACTOR $2,266 $3,750 Not Implemented
TT0284 # 09 Y:2023 09 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,087 $1,600 Not Implemented
TT0284 # 10 Y:2023 10 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,028 $60 Not Implemented
MU0020 # 01 Y:2022 01 2022 USE OPTIMUM TEMPERATURE $671 $0 Not Implemented
MU0020 # 02 Y:2022 02 2022 USE OPTIMUM TEMPERATURE $226,577 $176,800 Implemented
MU0020 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,861 $320 Not Implemented
MU0020 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $188 $0 Not Implemented
MU0020 # 05 Y:2022 05 2022 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $19 $87 Not Implemented
MU0020 # 06 Y:2022 06 2022 USE PHOTOCELL CONTROLS $2,049 $761 Not Implemented
MU0020 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $321 $661 Not Implemented
MU0020 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,404 $5,949 Implemented
MU0020 # 09 Y:2022 09 2022 REDUCE HEAT GAIN BY WINDOW TINTING $1,907 $16,186 Not Implemented
MU0020 # 10 Y:2022 10 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $210,000 $0 Implemented
IP0163 # 04 Y:2022 04 2022 USE PHOTOCELL CONTROLS $2,682 $248 Implemented
IP0163 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $712 $72 Implemented
IP0163 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,466 $3,681 Implemented
IP0163 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,570 $851 Implemented
IP0163 # 08 Y:2022 08 2022 RECOVER WASTE HEAT FROM EQUIPMENT $2,345 $2,259 Implemented
IP0163 # 09 Y:2022 09 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $640 $674 Implemented