IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

81

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0155 # 01 Y:2016 01 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $61,044 $120 Not Implemented
GT0890 # 04 Y:2012 04 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $28,969 $0 Not Implemented
GT0890 # 05 Y:2012 05 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $12,607 $6,000 Not Implemented
GT0890 # 03 Y:2012 03 2012 REDUCE VENTILATION AIR $36,009 $9,600 Not Implemented
GT0890 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,722 $19,250 Not Implemented
GT0890 # 01 Y:2012 01 2012 ADD AREA LIGHTING SWITCHES $1,457 $3,630 Not Implemented
GT0882 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,117 $155,150 Implemented
GT0882 # 08 Y:2011 08 2011 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $85,358 $222,000 Not Implemented
GT0882 # 07 Y:2011 07 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $17,800 $38,640 Implemented
GT0882 # 06 Y:2011 06 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $31,792 $136,000 Implemented
GT0882 # 05 Y:2011 05 2011 UPGRADE CONTROLS ON COMPRESSORS $16,076 $55,000 Implemented
GT0882 # 04 Y:2011 04 2011 METER WASTE WATER $3,614 $6,000 Not Implemented
GT0882 # 03 Y:2011 03 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $28,143 $70,000 Not Implemented
GT0882 # 02 Y:2011 02 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,201 $0 Not Implemented
GT0882 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,634 $0 Implemented
GT0868 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,232 $60,000 Implemented
GT0868 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,368 $4,750 Implemented
GT0868 # 01 Y:2009 01 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $27,075 $19,000 Not Implemented
GT0868 # 02 Y:2009 02 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,414 $3,000 Not Implemented
GT0868 # 03 Y:2009 03 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,079 $12,000 Not Implemented
GT0868 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,204 $4,676 Implemented
GT0771 # 01 Y:2003 01 2003 COMBINE UTILITY METERS $3,600 $0 Implemented
GT0771 # 02 Y:2003 02 2003 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $17,568 $23,870 Implemented
GT0771 # 03 Y:2003 03 2003 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $882 $650 Implemented
GT0771 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,260 $1,050 Implemented