IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

131

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0369 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $695 $2,500 Implemented
UM0369 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $443 $2,210 Not Implemented
UM0369 # 05 Y:2010 05 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,318 $21,700 Implemented
UM0369 # 06 Y:2010 06 2010 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $11,181 $2,254 Implemented
UM0369 # 07 Y:2010 07 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,409 $1,874 Not Implemented
UM0369 # 08 Y:2010 08 2010 INSULATE FEEDWATER TANK $1,281 $1,449 Not Implemented
UM0369 # 09 Y:2010 09 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,164 $1,000 Implemented
UM0369 # 10 Y:2010 10 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,010 $1,300 Implemented
MZ0049 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $823 $300 Implemented
MZ0049 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,416 $0 Not Implemented
MZ0049 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,012 $0 Implemented
MZ0049 # 04 Y:2010 04 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $180 $170 Implemented
MZ0049 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $5,075 $6,650 Implemented
MZ0049 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,075 $3,960 Not Implemented
MZ0049 # 07 Y:2010 07 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $217 $150 Implemented
MZ0049 # 08 Y:2010 08 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,410 $2,800 Implemented
MZ0049 # 09 Y:2010 09 2010 COMBINE UTILITY METERS $288 $0 Not Implemented
MZ0049 # 10 Y:2010 10 2010 REDUCE SCRAP PRODUCTION $3,156 $0 Implemented
MZ0049 # 11 Y:2010 11 2010 USE OPTIMUM TEMPERATURE $1,228 $0 Not Implemented
MZ0049 # 12 Y:2010 12 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,900 $37,600 Implemented
BD0378 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $9,404 $12,450 Implemented
BD0378 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,696 $100 Not Implemented
BD0378 # 03 Y:2010 03 2010 USE PHOTOCELL CONTROLS $1,578 $835 n/a
BD0378 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $361 $425 Not Implemented
TT0048 # 01 Y:2010 01 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $56,000 $1,000 Implemented