Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,360
matching recommendationsNAICS | 3363 | Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1904 # 11 Y:2019 | 11 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $828 | $1,150 | n/a |
UK1904 # 12 Y:2019 | 12 | 2019 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $986 | $3,960 | n/a |
UK1904 # 13 Y:2019 | 13 | 2019 | INSULATE BARE EQUIPMENT | $481 | $419 | n/a |
UK1904 # 14 Y:2019 | 14 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $40,920 | $180,000 | n/a |
UD0999 # 01 Y:2019 | 01 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,762 | $0 | Not Implemented |
UD0999 # 02 Y:2019 | 02 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $7,453 | $0 | Implemented |
UD0999 # 03 Y:2019 | 03 | 2019 | INSULATE BARE EQUIPMENT | $6,465 | $596 | Not Implemented |
UD0999 # 04 Y:2019 | 04 | 2019 | INSULATE BARE EQUIPMENT | $4,677 | $353 | Not Implemented |
UD0999 # 05 Y:2019 | 05 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $19,669 | $11,170 | Not Implemented |
TT0223 # 01 Y:2019 | 01 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $60,944 | $189,000 | Not Implemented |
TT0223 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36,339 | $172,868 | Implemented |
TT0223 # 03 Y:2019 | 03 | 2019 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $23,500 | $2,000 | Not Implemented |
TT0223 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,403 | $80 | Not Implemented |
TT0223 # 05 Y:2019 | 05 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,556 | $7,425 | Not Implemented |
TT0223 # 06 Y:2019 | 06 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,372 | $3,900 | Not Implemented |
TT0223 # 07 Y:2019 | 07 | 2019 | APPLY FOR INVESTMENT INCENTIVES | $4,144 | $40 | Not Implemented |
TT0223 # 08 Y:2019 | 08 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,166 | $1,000 | Not Implemented |
TT0223 # 09 Y:2019 | 09 | 2019 | OPTIMIZE PLANT POWER FACTOR | $657 | $1,500 | Not Implemented |
TT0223 # 10 Y:2019 | 10 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $159 | $200 | Not Implemented |
UD0997 # 01 Y:2019 | 01 | 2019 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $5,924 | $0 | Implemented |
UD0997 # 02 Y:2019 | 02 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,364 | $0 | Implemented |
UD0997 # 03 Y:2019 | 03 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,727 | $7,000 | Not Implemented |
UD0997 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $60,472 | $17,300 | Not Implemented |
UD0997 # 05 Y:2019 | 05 | 2019 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $17,400 | $27,000 | Not Implemented |
UD0997 # 06 Y:2019 | 06 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,359 | $2,540 | Not Implemented |