IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,360

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0997 # 07 Y:2019 07 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,640 $4,000 Not Implemented
UD0997 # 08 Y:2019 08 2019 INSTALL AUTOMATIC STACK DAMPER $19,943 $1,000 Not Implemented
UD0997 # 09 Y:2019 09 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $26,037 $50,514 Not Implemented
UD0997 # 10 Y:2019 10 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $66,439 $164,220 Implemented
UD0996 # 01 Y:2019 01 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,447 $0 Implemented
UD0996 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,125 $0 Not Implemented
UD0996 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,446 $0 Not Implemented
UD0996 # 04 Y:2019 04 2019 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $618 $0 Not Implemented
UD0996 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $618 $0 Implemented
UD0996 # 06 Y:2019 06 2019 COVER OPEN TANKS $8,047 $1,400 Not Implemented
UD0996 # 07 Y:2019 07 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $18,128 $3,500 Not Implemented
UD0996 # 08 Y:2019 08 2019 OPTIMIZE PLANT POWER FACTOR $127,402 $60,000 Implemented
UD0996 # 09 Y:2019 09 2019 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $48,531 $11,000 Implemented
UD0996 # 10 Y:2019 10 2019 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $37,159 $98,800 Not Implemented
UD0996 # 11 Y:2019 11 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $28,290 $5,250 Not Implemented
UD0996 # 12 Y:2019 12 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,848 $80,000 Implemented
NL0032 # 01 Y:2019 01 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $31,146 $40,000 Not Implemented
NL0032 # 02 Y:2019 02 2019 USE ULTRASONIC CLEANING $13,380 $15,575 Implemented
NL0032 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $126 $500 Implemented
TT0216 # 01 Y:2019 01 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,451 $2,000 Not Implemented
TT0216 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $14,507 $20,000 Implemented
TT0216 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,494 $3,750 Implemented
TT0216 # 04 Y:2019 04 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $1,254 $1,710 Implemented
TT0216 # 05 Y:2019 05 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,220 $20 Implemented
TT0216 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,054 $3,559 Implemented