Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
503
matching recommendationsNAICS | 3363 | Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1031 # 06 Y:2022 | 06 | 2022 | INSULATE BARE EQUIPMENT | $31,642 | $15,000 | Not Implemented |
UD1031 # 05 Y:2022 | 05 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,586 | $0 | Implemented |
UD1031 # 04 Y:2022 | 04 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,863 | $10,000 | Not Implemented |
UD1031 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,188 | $676 | Implemented |
UD1031 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,382 | $0 | Implemented |
UD1031 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,133 | $5,000 | Not Implemented |
UD1030 # 09 Y:2021 | 09 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,747 | $7,500 | Not Implemented |
UD1030 # 08 Y:2021 | 08 | 2021 | INSULATE BARE EQUIPMENT | $20,126 | $28,000 | Implemented |
UD1030 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,553 | $21,607 | Implemented |
UD1030 # 06 Y:2021 | 06 | 2021 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $5,833 | $4,000 | Not Implemented |
UD1030 # 05 Y:2021 | 05 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,569 | $35 | Not Implemented |
UD1030 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,026 | $340 | Implemented |
UD1030 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,468 | $4,319 | Not Implemented |
UD1030 # 02 Y:2021 | 02 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $281 | $0 | Not Implemented |
UD1030 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,340 | $0 | Implemented |
UD1000 # 03 Y:2019 | 03 | 2019 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,599 | $0 | Implemented |
UD1000 # 04 Y:2019 | 04 | 2019 | USE OPTIMUM THICKNESS INSULATION | $2,318 | $290 | Not Implemented |
UD1000 # 05 Y:2019 | 05 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,102 | $0 | Not Implemented |
UD1000 # 06 Y:2019 | 06 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $71,143 | $12,480 | Not Implemented |
UD1000 # 07 Y:2019 | 07 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,374 | $48,748 | Not Implemented |
UD1000 # 09 Y:2019 | 09 | 2019 | INSTALL OCCUPANCY SENSORS | $1,925 | $8,061 | Implemented |
UD1000 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $12,280 | $0 | Implemented |
UD1000 # 02 Y:2019 | 02 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,606 | $0 | Not Implemented |
UD1000 # 08 Y:2019 | 08 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,801 | $81,000 | Implemented |
UD0999 # 03 Y:2019 | 03 | 2019 | INSULATE BARE EQUIPMENT | $6,465 | $596 | Not Implemented |