Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

503

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1031 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $31,642 $15,000 Not Implemented
UD1031 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,586 $0 Implemented
UD1031 # 04 Y:2022 04 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,863 $10,000 Not Implemented
UD1031 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,188 $676 Implemented
UD1031 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,382 $0 Implemented
UD1031 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,133 $5,000 Not Implemented
UD1030 # 09 Y:2021 09 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,747 $7,500 Not Implemented
UD1030 # 08 Y:2021 08 2021 INSULATE BARE EQUIPMENT $20,126 $28,000 Implemented
UD1030 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,553 $21,607 Implemented
UD1030 # 06 Y:2021 06 2021 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,833 $4,000 Not Implemented
UD1030 # 05 Y:2021 05 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,569 $35 Not Implemented
UD1030 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,026 $340 Implemented
UD1030 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,468 $4,319 Not Implemented
UD1030 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $281 $0 Not Implemented
UD1030 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,340 $0 Implemented
UD1000 # 03 Y:2019 03 2019 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,599 $0 Implemented
UD1000 # 04 Y:2019 04 2019 USE OPTIMUM THICKNESS INSULATION $2,318 $290 Not Implemented
UD1000 # 05 Y:2019 05 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,102 $0 Not Implemented
UD1000 # 06 Y:2019 06 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $71,143 $12,480 Not Implemented
UD1000 # 07 Y:2019 07 2019 RECOVER WASTE HEAT FROM EQUIPMENT $24,374 $48,748 Not Implemented
UD1000 # 09 Y:2019 09 2019 INSTALL OCCUPANCY SENSORS $1,925 $8,061 Implemented
UD1000 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,280 $0 Implemented
UD1000 # 02 Y:2019 02 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,606 $0 Not Implemented
UD1000 # 08 Y:2019 08 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,801 $81,000 Implemented
UD0999 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $6,465 $596 Not Implemented