Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,366
matching recommendationsNAICS | 3363 | Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0132 # 09 Y:2018 | 09 | 2018 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $584 | $0 | Not Implemented |
TT0205 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $376,439 | $20 | Implemented |
TT0205 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $376,439 | $1,600 | Not Implemented |
TT0205 # 03 Y:2018 | 03 | 2018 | METER WASTE WATER | $30,463 | $1,000 | Not Implemented |
TT0205 # 04 Y:2018 | 04 | 2018 | OPTIMIZE PLANT POWER FACTOR | $28,188 | $132,000 | Not Implemented |
TT0205 # 05 Y:2018 | 05 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $19,941 | $160 | Not Implemented |
TT0205 # 06 Y:2018 | 06 | 2018 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $9,911 | $10,800 | Not Implemented |
TT0205 # 07 Y:2018 | 07 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $8,761 | $8,362 | Not Implemented |
TT0205 # 08 Y:2018 | 08 | 2018 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $5,176 | $6,900 | Not Implemented |
CL1801 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $68,074 | $111,703 | Not Implemented |
CL1801 # 02 Y:2018 | 02 | 2018 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $47,531 | $15,500 | Not Implemented |
CL1801 # 03 Y:2018 | 03 | 2018 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $25,853 | $4,700 | Not Implemented |
CL1801 # 04 Y:2018 | 04 | 2018 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $13,900 | $22,500 | Not Implemented |
CL1801 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,775 | $4,800 | Not Implemented |
CL1801 # 06 Y:2018 | 06 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,788 | $2,080 | Not Implemented |
MA0787 # 01 Y:2018 | 01 | 2018 | USE SOLAR HEAT FOR HEAT | $76,722 | $790,840 | Not Implemented |
MA0787 # 02 Y:2018 | 02 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,589 | $100 | Implemented |
MA0787 # 03 Y:2018 | 03 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,796 | $100 | Implemented |
MA0787 # 04 Y:2018 | 04 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,111 | $100 | Implemented |
MA0787 # 05 Y:2018 | 05 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $660 | $100 | Implemented |
OR0698 # 01 Y:2018 | 01 | 2018 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $32,214 | $597 | Not Implemented |
OR0698 # 02 Y:2018 | 02 | 2018 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $18,374 | $9,440 | Implemented |
OR0698 # 03 Y:2018 | 03 | 2018 | USE HEAT PUMP FOR SPACE CONDITIONING | $12,461 | $22,850 | Implemented |
OR0698 # 04 Y:2018 | 04 | 2018 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,148 | $325 | Implemented |
TT0206 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,406 | $32,616 | Not Implemented |