Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
231
matching recommendationsNAICS | 3363 | Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0084 # 05 Y:2017 | 05 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,415 | $130 | Implemented |
IP0084 # 06 Y:2017 | 06 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,221 | $290 | Implemented |
IP0084 # 07 Y:2017 | 07 | 2017 | INSULATE BARE EQUIPMENT | $974 | $203 | Implemented |
IP0084 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,534 | $928 | Not Implemented |
IP0084 # 09 Y:2017 | 09 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $910 | $416 | Not Implemented |
IP0084 # 10 Y:2017 | 10 | 2017 | APPLY FOR INVESTMENT INCENTIVES | $238 | $125 | Not Implemented |
IP0084 # 11 Y:2017 | 11 | 2017 | INSTALL OCCUPANCY SENSORS | $3,393 | $2,038 | Implemented |
IP0084 # 12 Y:2017 | 12 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $519 | $727 | Not Implemented |
IP0084 # 13 Y:2017 | 13 | 2017 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $446 | $1,250 | Implemented |
IP0084 # 14 Y:2017 | 14 | 2017 | OPTIMIZE PLANT POWER FACTOR | $13,460 | $43,320 | Not Implemented |
IP0084 # 15 Y:2017 | 15 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,680 | $25,865 | Implemented |
IP0083 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $25,016 | $5 | Implemented |
IP0083 # 02 Y:2017 | 02 | 2017 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $15,779 | $5 | Not Implemented |
IP0083 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,290 | $0 | Implemented |
IP0083 # 04 Y:2017 | 04 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,706 | $0 | Implemented |
IP0083 # 05 Y:2017 | 05 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $20,472 | $1,434 | Not Implemented |
IP0083 # 06 Y:2017 | 06 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $15,077 | $1,296 | Implemented |
IP0083 # 07 Y:2017 | 07 | 2017 | INSTALL OCCUPANCY SENSORS | $13,276 | $7,860 | Implemented |
IP0083 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,581 | $23,044 | Implemented |
IP0083 # 09 Y:2017 | 09 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,902 | $3,417 | Implemented |
IP0083 # 10 Y:2017 | 10 | 2017 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $3,250 | $5,000 | Not Implemented |
IP0083 # 11 Y:2017 | 11 | 2017 | OPTIMIZE PLANT POWER FACTOR | $8,640 | $34,900 | Not Implemented |
IP0069 # 01 Y:2016 | 01 | 2016 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $490 | $0 | Implemented |
IP0069 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,282 | $21 | Implemented |
IP0069 # 03 Y:2016 | 03 | 2016 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $5,637 | $3 | Not Implemented |