IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

204

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0069 # 06 Y:2016 06 2016 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,989 $215 Implemented
IP0069 # 07 Y:2016 07 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $27,384 $7,218 Implemented
IP0069 # 08 Y:2016 08 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $22,750 $12,163 Not Implemented
IP0069 # 09 Y:2016 09 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,712 $1,271 Not Implemented
IP0069 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,756 $4,316 Implemented
IP0069 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $231 $351 Implemented
IP0069 # 12 Y:2016 12 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $15,955 $38,395 Not Implemented
IP0061 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,775 $4 Implemented
IP0061 # 02 Y:2016 02 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,745 $0 Implemented
IP0061 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,196 $35 Implemented
IP0061 # 04 Y:2016 04 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $931 $20 Implemented
IP0061 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $5,310 $1,611 Implemented
IP0061 # 06 Y:2016 06 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,664 $3,260 Implemented
IP0061 # 07 Y:2016 07 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,734 $760 Not Implemented
IP0061 # 08 Y:2016 08 2016 RECYCLE WHITE WATER $61,804 $36,000 Implemented
IP0061 # 09 Y:2016 09 2016 INSTALL AN UNINTERUPTABLE POWER SUPPLY $230,000 $251,000 Not Implemented
IP0061 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,505 $75,569 Implemented
IP0034 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,454 $0 Implemented
IP0034 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,112 $0 Implemented
IP0034 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $111 $0 Not Implemented
IP0034 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,686 $636 Not Implemented
IP0034 # 05 Y:2015 05 2015 INSULATE BARE EQUIPMENT $974 $104 Not Implemented
IP0034 # 06 Y:2015 06 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,451 $845 Not Implemented
IP0034 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,425 $89,660 Not Implemented
IP0005 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $33,112 $0 Not Implemented