IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,371

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0137 # 04 Y:2014 04 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $16,610 $0 Implemented
MZ0137 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $805 $1,475 Implemented
MZ0137 # 06 Y:2014 06 2014 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $8,378 $0 Implemented
MZ0137 # 07 Y:2014 07 2014 AIR CONDITION ONLY SPACE NECESSARY $4,215 $0 Not Implemented
MZ0137 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,678 $7,200 Not Implemented
SU0359 # 01 Y:2014 01 2014 INSULATE FEEDWATER TANK $1,037 $137 Implemented
SU0359 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,651 $1,900 Implemented
SU0359 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $1,346 $470 Implemented
SU0359 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $931 $855 Implemented
SU0359 # 05 Y:2014 05 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $78,976 $119,000 Not Implemented
SU0359 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,476 $4,124 Implemented
UM0439 # 01 Y:2014 01 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $32,824 $20,000 Not Implemented
UM0439 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,150 $21,000 Not Implemented
UM0439 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,596 $2,500 Implemented
UM0439 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $27,566 $4,000 Implemented
TT0128 # 01 Y:2014 01 2014 DISCONNECT BALLASTS $293 $0 Implemented
TT0128 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $125 $180 Implemented
TT0128 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $1,294 $1,550 Implemented
TT0128 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,860 $15,980 Implemented
TT0128 # 05 Y:2014 05 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $14,016 $23,710 Implemented
TT0128 # 06 Y:2014 06 2014 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $598 $2,350 Implemented
TT0128 # 07 Y:2014 07 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,636 $18,000 Not Implemented
TT0128 # 08 Y:2014 08 2014 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $15,563 $110,000 Not Implemented
IA0514 # 01 Y:2014 01 2014 DIRECT WARMEST AIR TO COMBUSTION INTAKE $18,117 $82,200 Not Implemented
IA0514 # 02 Y:2014 02 2014 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,046 $55,230 Not Implemented