IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

68

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0548 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,596 $700 Not Implemented
IA0548 # 08 Y:2015 08 2015 USE PHOTOCELL CONTROLS $408 $2,000 Not Implemented
IA0548 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,809 $140 Not Implemented
IA0548 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $1,065 $2,700 Not Implemented
IA0548 # 06 Y:2015 06 2015 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $1,746 $60 Not Implemented
IA0548 # 04 Y:2015 04 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,432 $23,803 Not Implemented
IA0548 # 02 Y:2015 02 2015 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $17,173 $8,320 Not Implemented
IA0548 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,227 $82,355 Not Implemented
IA0514 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $665 $35 Not Implemented
IA0514 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $4,335 $2,887 Not Implemented
IA0514 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $584 $687 Implemented
IA0514 # 01 Y:2014 01 2014 DIRECT WARMEST AIR TO COMBUSTION INTAKE $18,117 $82,200 Not Implemented
IA0514 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,311 $140 Implemented
IA0514 # 03 Y:2014 03 2014 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,061 $1,012 Not Implemented
IA0514 # 02 Y:2014 02 2014 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,046 $55,230 Not Implemented
IA0514 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,369 $3,150 Not Implemented
IA0508 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,022 $210 Not Implemented
IA0508 # 09 Y:2013 09 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $3,758 $976 Implemented
IA0508 # 08 Y:2013 08 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,512 $1,000 Implemented
IA0508 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $598 $394 Not Implemented
IA0508 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $6,734 $5,775 Not Implemented
IA0508 # 05 Y:2013 05 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $689 $1,590 Implemented
IA0508 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $6,113 $6,000 Implemented
IA0508 # 03 Y:2013 03 2013 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,845 $1,000 Implemented
IA0508 # 02 Y:2013 02 2013 REPAIR OR REPLACE STEAM TRAPS $14,349 $3,750 Implemented