Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
68
matching recommendationsNAICS | 3363 | Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0548 # 04 Y:2015 | 04 | 2015 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,432 | $23,803 | Not Implemented |
IA0548 # 02 Y:2015 | 02 | 2015 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $17,173 | $8,320 | Not Implemented |
IA0548 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,809 | $140 | Not Implemented |
IA0548 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,227 | $82,355 | Not Implemented |
IA0548 # 07 Y:2015 | 07 | 2015 | INSTALL OCCUPANCY SENSORS | $1,065 | $2,700 | Not Implemented |
IA0548 # 08 Y:2015 | 08 | 2015 | USE PHOTOCELL CONTROLS | $408 | $2,000 | Not Implemented |
IA0548 # 06 Y:2015 | 06 | 2015 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $1,746 | $60 | Not Implemented |
IA0548 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,596 | $700 | Not Implemented |
IA0514 # 06 Y:2014 | 06 | 2014 | INSTALL OCCUPANCY SENSORS | $584 | $687 | Implemented |
IA0514 # 01 Y:2014 | 01 | 2014 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $18,117 | $82,200 | Not Implemented |
IA0514 # 02 Y:2014 | 02 | 2014 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $11,046 | $55,230 | Not Implemented |
IA0514 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $4,335 | $2,887 | Not Implemented |
IA0514 # 03 Y:2014 | 03 | 2014 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $1,061 | $1,012 | Not Implemented |
IA0514 # 08 Y:2014 | 08 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,369 | $3,150 | Not Implemented |
IA0514 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,311 | $140 | Implemented |
IA0514 # 05 Y:2014 | 05 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $665 | $35 | Not Implemented |
IA0508 # 10 Y:2013 | 10 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,022 | $210 | Not Implemented |
IA0508 # 09 Y:2013 | 09 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,758 | $976 | Implemented |
IA0508 # 08 Y:2013 | 08 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,512 | $1,000 | Implemented |
IA0508 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $598 | $394 | Not Implemented |
IA0508 # 06 Y:2013 | 06 | 2013 | INSTALL OCCUPANCY SENSORS | $6,734 | $5,775 | Not Implemented |
IA0508 # 05 Y:2013 | 05 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $689 | $1,590 | Implemented |
IA0508 # 04 Y:2013 | 04 | 2013 | OPTIMIZE PLANT POWER FACTOR | $6,113 | $6,000 | Implemented |
IA0508 # 03 Y:2013 | 03 | 2013 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $2,845 | $1,000 | Implemented |
IA0508 # 02 Y:2013 | 02 | 2013 | REPAIR OR REPLACE STEAM TRAPS | $14,349 | $3,750 | Implemented |